Similar Projects
Area at Ave E and Ave H (Ferguson Park District) - City of Temple
Infrastructure
Conception
$1,300,000 CJ est. value
Temple, TX 76501

Area at Ave E and Ave H (Ferguson Park District) - City of Temple
Infrastructure
Conception
$1,300,000 CJ est. value
Temple, TX 76501

Yerico Manufacturing - Manufacturing Space & Accessory Office
New Construction, Infrastructure - 20,064 SF
Design
$4,000,000 CJ est. value
Elgin, TX 78621

Lake Belton High School - Belton Independent School District
New Construction, Infrastructure
Design
$125,600,000 CJ est. value
Temple, TX 76504

O'Reilly Auto Parts (HTT) / Huntington
New Construction, Infrastructure - 7,225 SF
Bidding
$1,500,000 CJ est. value
Huntington, TX 75949

O'Reilly Auto Parts (HTT) / Huntington
New Construction, Infrastructure - 7,225 SF
Bidding
$1,500,000 CJ est. value
Huntington, TX 75949

Three-Way Road Project
Infrastructure
Post-Bid
TX

HSH Surgical Ambulatory Regional Centers
Infrastructure, Build-out - 8,031 SF
Post-Bid
$1,500,000 CJ est. value
Lufkin, TX 75904

Construction of E. Avenue H Improvements - Mesquite to Jackrabbit
Results
Nolanville, TX

SH 21 - Preventive Maintenance
Infrastructure
Results
$8,573,610 est. value
TX

Cotton Patch Cafe
New Construction
Construction
$1,300,000 est. value
Palestine, TX 75801

Take 5 Oil Change
New Construction - 1,430 SF
Construction
$800,000 est. value
Killeen, TX 76549

Iglesia Cristiana Church / Killeen
New Construction, Infrastructure - 10,000 SF
Pending Verification
$500,000 CJ est. value
Killeen, TX 76541

Playground Improvements- Southwest ES
Infrastructure
Pending Verification
$149,600 CJ est. value
Belton, TX 76513

Jones Park Renovations (Midtown District) - City of Temple
Renovation, Infrastructure
Conception
$1,000,000 CJ est. value
Temple, TX 76504

Last Updated 01/17/2023 03:03 PM
Project Title

Allsup's #351 / Robert Lee

Physical Address View project details and contacts
City, State (County) Robert Lee, TX 76945   (Coke County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Food/Beverage Service, Gas Station, Paving/Reconstruction, Site Development, Vehicle Sales/Service
Contracting Method Bids by Invitation
Project Status Construction start expected April 2022
Bids Due View project details and contacts
Estimated Value $2,500,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of February 10 2022 this project is in late planning. New convenience Store and fueling station Square Footage: 5,656 ft 2 *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

5,656 SF.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Concrete Finishing.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Panel Doors, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Resilient Flooring, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Vehicle Service Equipment, Vehicle-Washing Equipment, Refrigerated Display Equipment, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Walk-In Coolers, Foodservice Shelving, Food Cooking Equipment, Food Dispensing Equipment, Soda Fountain Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Countertops, Furnishing Accessories, Waste Receptacles, Rugs and Mats, Entrance Floor Mats and Frames, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Screening Devices, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 44 - Pollution and Waste Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents