Similar Projects
Bastrop High School New Academic Wing and Renovations
New Construction, Renovation
Conception
Bastrop, TX 78602

Bastrop High School Renovation of Sports Center and Locker Rooms
Renovation
Conception
Bastrop, TX 78602

CAST Med High School Athletic Facilities Renovations
Renovation
Design
$20,000,000 est. value
San Antonio, TX 78235

Brackenridge High School Athletic Facility Renovations
Renovation
Design
$38,385,545 est. value
San Antonio, TX 78210

Construction of Secure Entries at Jr. High and High School
Alteration
Bidding
Diboll, TX 75941

Miscellaneous Construction Contracted Services
New Construction, Renovation
Bidding
Bastrop, TX

Cedar Creek High School Renovations
Renovation, Addition - 35,000 SF
Sub-Bidding
$7,000,000 est. value
Cedar Creek, TX 78612

Westwood ISD Junior High Additions and Renovations
Addition
Sub-Bidding
Palestine, TX 75803

Lufkin ISD Middle School
Post-Bid
Lufkin, TX 75904

CTE Addition and Ag Pavilion
Addition
Post-Bid
Elkhart, TX

Design Build Services for Energy Efficiency and Facility Improvement
Results
Lufkin, TX 75901

New Intermediate School and New Maintenance & Transportation Center
New Construction - 223,000 SF
Results
Less than $71,443,100 est. value
Bryan, TX 77801

Construction Management Services 2018 Bond Program PKG050 High School #12
New Construction
Construction
Less than $130,301,193 est. value
Rosharon, TX

Alvin Independent School District New High School Campus 4
New Construction
Construction
Less than $126,500,000 est. value
Alvin, TX 77511

New Middle School
New Construction
Pending Verification
Los Fresnos, TX

Last Updated 05/06/2022 09:15 AM
Project Title

New Hill Country College Preparatory High School

Physical Address View project details and contacts
City, State (County) TX   (Comal County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $25,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Renovation of an educational facility in Spring Branch, Texas. Completed plans call for the renovation of a educational facility. **As of May 4, 2022 no award has been made yet. A timeline for award has not yet been established.** New construction of Comal ISD Hill Country College Preparatory High School and associated site work. Core capacity enrollment: 500 students Substantial completion: May 2024 Opening: August 2024 Project site: US Hwy 281 N and Mustang Vista, Comal County Construction budget: $25,000,000.00 exclusive of contractor overhead and profit Last Date for questions/clarifications March 24, 2022 12:00 PM CST The District reserves the right to: (1) conduct interviews with the five or fewer top-ranked firms, as deemed to be in the best interests of the District; (2) reject any or all Qualifications Statements and to make awards as may be advantageous to the District; (3) to hold Qualifications Statements for ninety days from submission date without action; and (4) to waive irregularities or technicalities in the Qualifications Statements in order to take an action which is in the best interests of the District. Comal ISD guarantees no quantities, dollar amounts, or awards to any Respondent and reserves the right to terminate the services of any selected Respondent at any time if not satisfied with the Respondent's performance. The District will consider and evaluate all Qualifications Statements meeting the stated specifications. Any questions on this RFQ must be submitted in writing and e-mailed to Karlie Beach, Purchasing Coordinator for Comal ISD at karlie.beach@comalisd.org. All correspondence after the issuance of this RFQ shall be directed through the Comal ISD Director of Purchasing as identified in this document. Any contact outside of the Director of Purchasing will be considered non-compliance and cause for rejection of qualifications packet. All questions or requests for clarification must be received no later than March 24, 2022 at 12:00 PM CST to ensure that there is adequate time to respond and take appropriate action (if needed) prior to the deadline. Any qualification submittals received after March 29, 2022 at 10:00 AM CST shall be returned to the proposer unopened. Comal ISD will not be liable for any cost incurred in the preparation of any response.

Details

Middle/Senior High School, New Construction.
Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents