Similar Projects
The WHARF - Waterline
Infrastructure
Bidding
Westwego, LA

Improvements to Causeway Boulevard and Scott Street Sewer Lift Station
New Construction, Infrastructure
Post-Bid
Gretna, LA

Three 30 Pratt Type Xr-70 150B Butterfly Valves
Infrastructure
Post-Bid
Gretna, LA

John Hopkins Sewer Force Main Replacement
Infrastructure
Results
$707,900 est. value
Kenner, LA

On-Call Water Valve Operation Services
Infrastructure
Results
New Orleans, LA

Supply of Miscellaneous Pipeline Maintenance Items
Term Contract
Post-Bid
LA

43 Watermain Replacement
Infrastructure
Results
Less than $12,895,874 est. value
New Orleans, LA

Backflow Preventers and Couplings
Term Contract
Post-Bid
New Orleans, LA

Bayou Saint John, Fairgrounds, Seventh Ward Group E (FRC)
Infrastructure
Results
New Orleans, LA

Back Flow Inspection
Infrastructure
Post-Bid
Kenner, LA 70062

East Bank Mississippi River Outflow Sampling Station
Infrastructure
Results
New Orleans, LA

Grand Isle Waterline and Valve Platform Repairs
Infrastructure
Results
Gretna, LA

Julia Street Wharf Water Main Repairs
Infrastructure
Results
New Orleans, LA

One Time Purchase of Pipe to be Used for Waterline Re-Location Project
Infrastructure, Alteration
Results
Kenner, LA 70097

Brass Water Service Fittings
Infrastructure
Results
New Orleans, LA

Last Updated 01/19/2022 11:31 AM
Project Title

Transmission Main Replacement

Physical Address View project details and contacts
City, State (County) New Orleans, LA   (Jefferson County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Transmission Main Replacement - Grape Street, (College CT, South Norman, C. Francis Parkway) Eden Street (South Norman C. Francis Parkway - South Dupre Street) and South Dupre Street (Eden Street - Martin Luther King Boulevard) The Project contemplated consists of Compression fit HDPE lining existing 43 cast iron water transmission main, installing 42 ductile iron pipe and ductile iron fittings, connecting to existing 42 cast iron pipe and 43 steel pipe, installing blow off valves, replacing existing 8 sewer main and repairing streets, sidewalks and driveways

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents