Similar Projects
Student Health and Wellness Center - University of Wisconsin
New Construction, Infrastructure - 133,100 SF
Design
$35,431,000 CJ est. value
Stevens Point, WI 54481

Student Health and Wellness Center - University of Wisconsin
New Construction, Infrastructure - 133,100 SF
Design
$35,431,000 CJ est. value
Stevens Point, WI 54481

RFP Construction Manager at Risk - New Portage County Health Care Center
New Construction, Infrastructure
Bidding
$2,500,000 CJ est. value
Stevens Point, WI 54481

Chip Sealing Roads
Post-Bid
Stevens Point, WI

Granite - Base Coarse -Seal Coating
Infrastructure
Post-Bid
Stevens Point, WI

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Pavement Milling and Reclaiming
Results
Stevens Point, WI

RFP Engineering - Overlay
Infrastructure
Pending Verification
$500,000 CJ est. value
Plover, WI 54482

RFP Engineering - Overlay
Infrastructure
Pending Verification
$500,000 CJ est. value
Plover, WI 54482

Snow Plowing Service
Term Contract
Post-Bid
Stevens Point, WI

2021 Street Improvement
Results
Stevens Point, WI 54481

RFP Engineering - Perpetuation - Resurfacing - STH 161
Infrastructure
Pending Verification
$3,000,000 CJ est. value
Amherst Junction, WI 54407

Street Sweeping Service
Term Contract
Post-Bid
Stevens Point, WI

2021 Road Resurfacing
Results
Stevens Point, WI

Water Quality Trading Clearinghouse
Infrastructure
Post-Bid

Last Updated 08/09/2022 07:04 PM
Project Title

4th Avenue Street Project Proposal Project

Physical Address View project details and contacts
City, State (County) Almond, WI 54909   (Portage County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $600,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

4th Avenue Street Project Proposal Project Overview 4th Avenue From County Road J, Approximately 2,638 Ft. East to 4th Street. Town of Almond-portage County 001-pulverization: Approximately 5,863.36 Sy - Pulverize Existing Asphalt Pavement. (330.3) - Grade Existing Pulverized Asphalt Pavement. Total Cost for Item 001- Pulverization of Existing Asphalt Pavement 002-sawing: Sawcut Existing Asphalt for a Clean Butt Joint. 42 Feet Approximate Lf (West End) 4th Ave and County Road J 91 Feet Approximate Lf (East End) 4th Ave and 4th Street 133 Feet Total Approximate Lf Asphalt Sawing (690.3.3) Total Cost of Item 002 - Sawing of Existing Asphalt 003-base Course: Approximately 2,386 Tons - Furnish and Install Four (4) Inches of Wisdot Spec 1 - 1/4 Bad Material - Furnish and Install an Additional Six (6) Inches of Wisdot Spec 1 - 1/4 Bad Material Approximately 900 Feet, East of County Road J on 4th Ave for 700 Feet. - Fine Grade Wisdot Spec 1 - 1/4 Bad Material - Furnish and Install Water for Dust Control and Compaction. - Furnish and Complete Compaction on Wisdot Spec 1-1/4 Bad Material (301.3.4.2) Total Cost of Item 003- Base Course 004-hma Pavement: Approximately 650 Tons Furnish and Install Wisdot Spec Type L Asphalt Mix-twenty (20) Feet Wide. Compact Wisdot Spec Type L Asphalt Mix to an Average Thickness of Two (2) Inches Total Cost of Item 004- Hma Pavement 005- Shouldering/base Course: Approximately 380 Tons - Furnish and Install Wisdot Spec Inch Bad Material Creating a Two (2)- Foot Shoulder (305.3.4) - Furnish and Complete Compaction on Wisdot Spec Inch Bad Material - Furnish and Install Water for Compaction Total Cost for Item 005- Shouldering/base Course 006-traffic Control/signage Furnish and Maintain Traffic Control/signage for Project Duration Total Cost for Item 006 007- Corrugated Metal Pipe - Install One, 24-inch Corrugated Metal Pipes Approximately 1,100 Feet East of County Hwy J, 4th Ave Cross Drains. - Install One, 18-inch Corrugated Metal Pipe-personal Entrance (Pe) 7487 4th Avenue. - Maintain Correct Pipe Cover According to Cmp Manufacturer Total Cost for Item 007- Corrugated Metal Pipe Total Project Cost Specials/other: 4th Avenue East and 4th St., Proposed Approximate Intersection Radius-40 Feet 4nd Avenue West and County J, Proposed Approximate Intersection Radius40 Feet Contractor is Responsible for All Utility Locates.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents