Similar Projects
Edgewood Road Trail Phase 2B - Bridge Modifications and Trail
Conception
$4,060,000 est. value
Cedar Rapids, IA 52407

Shaver Road Bridge and Floodwall, Phase 4
Conception
$1,500,000 est. value
Cedar Rapids, IA 52402

Bridge Replacement - CCS
New Construction, Infrastructure
Bidding
IA

Route: 270th Street - Bridge Replacement - CCS
New Construction, Infrastructure
Bidding
IA

Camp Dodge Training Area Bridge Replacement
Renovation
Post-Bid
Johnston, IA

2nd Avenue Bridge over the Des Moines River Rehabilitation and 2nd Avenue Bridge over Birdland Drive Replacement
New Construction, Infrastructure
Post-Bid
Des Moines, IA 50982

West Des Moines Digital Enterprise Segment 5-3 Raccoon River Crossing
New Construction
Results
West Des Moines, IA

Bridge Replacement with Twin RCB - BR 1270
New Construction
Results
Less than $375,000 est. value
Polk City, IA

Route: U.S. 30 - Bridge Replacement - PPCB
New Construction, Infrastructure
Bidding
IA

Bridge Replacement on Hickory Valley Road
New Construction, Infrastructure
Post-Bid
IA

2021 Bridge Repair
Renovation, Infrastructure
Results
Webster City, IA 50595

Mount Vernon Road - Bridge Deck Overlay
Renovation, Infrastructure
Bidding
IA

Bridge Replacement on North Bankston Road
New Construction, Infrastructure
Post-Bid
IA

Booneville Road Bridge Over Johnson Creek
New Construction
Results
$1,461,000 est. value
West Des Moines, IA 50266

Bridge Replacement at Chesterman Road Project
New Construction, Infrastructure
Bidding
Peosta, IA 52068

Last Updated 04/12/2022 06:04 AM
Project Title

Three Bridges Pedestrian Bridge Improvements

Physical Address View project details and contacts
City, State (County) Marshalltown, IA   (Marshall County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value $6,000,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The extent of the work will involve furnishing the labor, equipment, and materials necessary for constructing the Three Bridges Pedestrian Bridge Project in Quarry, Iowa as shown in the plans and specifications for Project No. 8853 including: Wooden Bridge Demolition, Wooden Bridge Construction, and Soil Stabilization in Marshall County.

Details

Bridge, Renovation.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents