Similar Projects
Apex Warehouse - Drainage Rehabilitation
Infrastructure
Bidding
Apex, NC 27502

Wilders Grove Stream Restoration
Infrastructure
Bidding
Raleigh, NC

Raleigh Green Stormwater Infrastructure Retrofits
Post-Bid
Less than $600,000 est. value
Raleigh, NC 27602

East River Phase 2 Project
Post-Bid
Clayton, NC 27527

Lexington Middle School Storm Culvert
Results
Less than $77,500 est. value
Lexington, NC 27292

Erosion and Sediment Control and Rough Grading for a new Ashe County Middle School
Results
NC

W-5601DH 3rd and Dock Street
Infrastructure
Bidding
Wilmington, NC 28401

WWTP Erosion Discharge Repair
Post-Bid
Clinton, NC

USDA FS NFsNC Tusquitee RD Shuler Creek Stream Restoration Project
Results
$25,000 to $100,000 est. value
Murphy, NC 28906

Utley Creek Greenway Connection
New Construction, Infrastructure
Bidding
Holly Springs, NC

Replace Grounds in the 1-7 ADA BN Motor pool X4622, Fort Bragg, NC
Post-Bid
Fayetteville, NC 28307

FY 19-20 Drainage Infrastructure Improvements
Results
Nags Head, NC

Corrugated Aluminum Pipe
Infrastructure
Bidding
Roxboro, NC 27574

Pond Breach and French Drain Package of the E-51 Woods Creek Elementary School Project
Post-Bid
Cary, NC

Streambank Repairs
Results
Raleigh, NC 27604

Last Updated 10/04/2021 01:31 AM
Project Title

Corrugated Metal Pipe

Physical Address View project details and contacts
City, State (County) Blanch, NC 27212   (Caswell County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1 100 Ft 12” x 20’ x .064” Thickness Corrugated Metal Pipe, Plain 2 4 Ea Connecting Bands For 15” Corrugated Metal Pipe, Plain 3 100 Ft 15” x 20’ x .064” Thickness Corrugated Metal Pipe, Plain 4 4 Ea Connecting Bands For 15” Corrugated Metal Pipe, Plain

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents