Similar Projects
Madison Chocolate Company
Build-Out, Alteration - 3,125 SF
Design
Madison, WI 53719

Monona Terrace Loading Dock and Parking Area Repair
Infrastructure
Post-Bid
Madison, WI

Concrete Sidewalk at Warner Park Community Recreation Center
Infrastructure
Post-Bid
Madison, WI 53704

Boardwalk Replacement
Results
De Forest, WI 53532

Dunning Street, Jackson Street and Lafollette Avenue Reconstruction Assessment District - 2020
Results
Less than $4,034,805 est. value
Madison, WI 53704

Sandhill Elementary School Pavement Restoration - Parking Lot and Playground Service Drive
Results
Stoughton, WI 53589

Spring Green - Madison, Walter Road
Results
WI

North Mendota Trail - West Segment Phase B
Results
Middleton, WI 53562

Hubbard Avenue, Mayflower Drive, Violet Place, Orchid Lane Reconstruction
Results
Less than $2,472,200 est. value
Middleton, WI 53562

Parking Lots, Curbs, and Exterior Lighting - MEP
Results
$570,000 est. value
Madison, WI 53718

Parking Lots, Curbs, and Exterior Lighting - General
Results
$570,000 est. value
Madison, WI 53718

2021 CTH MN/Broadhead Street Utility and Street Improvements
Results
McFarland, WI 53558

Resurfacing 2021 - Curb, Gutter and Castings
Results
$900,000 est. value
Madison, WI 53787

Village of Dane Southeast Public Works Loop
Results
Dane, WI

Chicory Way, Juniper Street and Aspen Place Reconstruction
Results
$25,000,000 est. value
Sun Prairie, WI

Last Updated 10/27/2021 12:14 PM
Project Title

Promega Kepler Warehouse

Physical Address View project details and contacts
City, State (County) Fitchburg, WI 53711   (Dane County)
Category(s) Heavy and Highway, Industrial/Manufacturing
Sub-Category(s) Industrial Warehouse, Sidewalks/Parking Lot
Contracting Method General Contractor to Subcontract.
Project Status Construction Commenced third quarter 2021, No Sub Bids Needed
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Promega Kepler building addition and parking lot addition.

Details

Industrial Warehouse, 135,000 SF Addition.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Coiling Doors and Grilles, Windows.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Fire Protection Specialties.
Division 11 - Equipment, Loading Dock Equipment, Loading Dock Bumpers, Stationary Loading Dock Equipment, Portable Dock Equipment, Loading Dock Lights.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Flood Lighting.
Division 27 - Communications.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings, Fences and Gates, Screening Devices.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents