Similar Projects
Bridge Pile Repairs - Phase 2
Infrastructure
Post-Bid
Atlantic City, NJ 08401

Atlantic City Expressway Bridge #28 Rehabilitation Project
Results
Atlantic City, NJ

Drawbridge Preventive Maintenance
Results
$20,000,001 to $50,000,000 est. value

Drawbridge Preventive Maintenance Contract
Results
$10,000,001 to $20,000,000 est. value

Drawbridge Preventive Maintenance Contract
Results
$10,000,001 to $20,000,000 est. value

Mid Atlantic Construction IDIQ (MATOC)
Results
$50,000 to $2,000,000 est. value

Maintenance Movable Bridge and Tunnel Repair Contract
Results
$10,000,001 to $20,000,000 est. value

Bridge Pile Repairs
Results
Atlantic City, NJ 08401

Maintenance Orphan Bridge Repair Contract 2020-1, Various Locations, Statewide
Results
Less than $5,000,000 est. value

Maintenance Job Order Contracting (JOC) Bridge Repairs, South - 2019
Results
$5,000,001 to $10,000,000 est. value

Route 30 Bridge Over Beach Thorofare
Results
$10,000,001 to $20,000,000 est. value
Atlantic City, NJ 08401

Replacement of Nacote Creek Bridge (PR-07) Old New York Road (CR-610) Over Nacote Creek
Results
Port Republic, NJ 08241

Bridge Repairs and Resurfacing; Milepost 0 to 126 (2021)
Results

Signature Bridge Preventive Maintenance Contract 2019-1
Results
$20,000,001 to $50,000,000 est. value

Maintenance Movable Bridge and Tunnel Repair Contract, Statewide - 2021
Results
$10,000,001 to $20,000,000 est. value

Last Updated 07/26/2021 08:28 AM
Project Title

Replacement of Ohio Avenue Bridge

Physical Address View project details and contacts
City, State (County) Atlantic City, NJ 08401   (Atlantic County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1. Removal and replacement of the bridge including adjacent timber sheet pile walls 2. Constrnction of concrete vertical curb, concrete sidewalk and hot mix asphalt approach roadway 3. Removal of the existing adjacent pedestrian bridge 4. Topsoil, fertilizer and seed will be placed at all disturbed areas. Areas affected by the proposed work will be re-graded. 5. All related incidental work, including traffic control, dust control, soil erosion control, cleaning and restoration.

Details

Bridge, Addition.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents