Similar Projects
Rosendahl Properties - Idella Ridge Subdivision
Infrastructure
Bidding
$510,000 est. value
Menomonie, WI

Road Project - Paving
Infrastructure
Bidding
$190,000 est. value
Albertville, WI 54730

2021 Road Improvements
Infrastructure
Post-Bid
Sand Creek, WI

2021 Road Paving
Infrastructure
Post-Bid
Sand Creek, WI 54757

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

1058th Avenue Paving & 970th Avenue Chip Sealing
Results
Wheeler, WI

Road Project - Road Base Material
Infrastructure
Bidding
Albertville, WI 54730

Blacktop
Infrastructure
Post-Bid
Clear Lake, WI 54005

Statewide Pavement Maintenance 2021-2022
Term Contract
Results
Less than $5,000 est. value

Menomonie - Ridgeland; S Fork Lower Pine Creek C-17-0049
New Construction, Infrastructure
Post-Bid
$500,000 to $749,999 est. value
Menomonie, WI 54751

Crestwood Acres Neighborhood Street Reconstruction
Results
Weston, WI

Caryville - CTH M, CTH HH to CTH M
Infrastructure
Post-Bid
$2,000,000 to $2,999,999 est. value
Elk Mound, WI 54739

21st Street and Utility Improvements
Results
Menomonie, WI

Menomonie River Road Resurfacing
Results
Menomonie, WI

Road Improvements
Results
Colfax, WI

Reported 05/18/2022 12:00 AM
Project Title

Town Road Reconstruction

Physical Address View project details and contacts
City, State (County) Modena, WI   (Dunn County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected June 2022
Bids Due View project details and contacts
Estimated Value $284,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Town of Rock Creek, Dunn County, Wisconsin is seeking bids for reconstruction or overlay of several town road projects as listed below. Project 1 Crack Sealing and Chip Coat 150th Avenue from CTH O to 810th Street. Total project length approximately 7920 feet. Project is to include the following: 1. Crack sealing only from CTH O west to 890th Street, approximately 2640 feet. 2. Double chip and seal coat from 890th Street west to 880th Street, approximately 1320 feet by 20 feet wide 3. Crack sealing only from 880th Street west to 850th Street, approximately 3960 feet. 90th Avenue from 1010th Street east to CTH H. Total project length approximately 10560 feet. Project is to include the following: 1. Crack sealing only from 1010th Street east to CTH H. Total project length approximately 10560 feet 1010th Street from 140th Avenue north to 190th Street. Total project length approximately 6600 feet. 1. Single chip and seal coat, approximately 6600 feet in length by 20 feet wide. Project 2 Pulverize and Repave 110th Avenue from 1010th Street west to 1000th Street. Total project length approximately 1320 feet. Project is to include the following: 1. Preparation of roadway subgrade. Prepare 27 feet wide road base with adequately safe side slopes, ditches, and drainage control. Seeding and mulching of disturbed soils. Lump sum bid required for this item. 2. Pulverization of existing pavement (existing pavement approximately 2" thickness). Approximately, 3000 square yards required. 3. Additional crushed limestone base course added to create a total thickness of 6 inches of base course, compacted. Approximately, 800 tons required. 4. Machine compaction, watering, and fine grading of road base. Incidental to Item 3. 5. Placement of asphaltic pavement, 2.5" compacted thickness, 20 feet wide. Approximately 460 tons required. 6. 2 feet wide crushed limestone shoulders compacted. Approximately, 125 tons of gravel required. 7. Milling of joints at west end of project. Approximately, 20 linear feet. Incidental to Item 2. Project 3 2 thick Asphaltic Overlay 140th Avenue from 1000th Street east to county line. Total project length approximately 1320 feet. Project is to include the following: 1. Placement of asphaltic pavement with binder, 2.0 compacted thickness, 20 feet wide. Approximately 370 tons required. 2. 2 feet wide crushed limestone shoulders compacted. Approximately, 125 tons of gravel required. 3. Milling of joints at east end of project. Approximately, 20 linear feet. Incidental to Item 2. Project 4 2 thick Asphaltic Overlay 1000th Street from 90th Avenue north to 110th Avenue. Total project length approximately 2640 feet. Project is to include the following: 1. Placement of asphaltic pavement with binder, 2.0 compacted thickness, 20 feet wide. Approximately 740 tons required. 2. 2 feet wide crushed limestone shoulders compacted. Approximately, 250 tons of gravel required. 3. Milling of joints at each end of project. Approximately, 40 linear feet. Incidental to Item 2. Please provide individual bids for each project using the following unit prices: 1. Asphalt paving: Tons 2. Crushed limestone base: Tons 3. Crushed limestone shoulders: Tons 4. Pulverization of existing pavement: Square Yards 5. Preparation of roadway subgrade: Lump Sum 6. Crack sealing and chip coat Lump Sum ALSO, provide an estimated total for all segments as a single project using the above units. Final cost paid to be determined by units used times unit prices bid. Bid bond required. Scheduled completion by October 31, 2022. The Town of Rock Creek reserves the right to reject any or all bids. For more information and bid tabs contact Town Chair Harry Warden, E8629 150th Avenue, Mondovi, WI 54755, phone 715-875-4745 or 715-495-6316(mobile). Or Road Maintenance Superintendent Chris Gruber 715-579-7634

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents