Similar Projects
Sunrise Mall Macy's Redevelopment Phase 2
New Construction
Conception
Citrus Heights, CA 95610

Sunrise Mall Redevelopment Phase 3
New Construction
Conception
Citrus Heights, CA 95610

20th Place Project
New Construction, Demolition - 45,480 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Sacramento, CA 95811

16 & V in Richmond Grove
New Construction - 57,950 SF
Design
$11,600,000 est. value
Sacramento, CA 95818

RFQ Engineering - Design Services for Merced to Madera
Infrastructure
Post-Bid
$1,000,000 CJ est. value
Sacramento, CA 95814

RFQ Engineering - Design Services for Merced to Madera
Infrastructure
Post-Bid
$1,000,000 CJ est. value
Sacramento, CA 95814

Design Build - Construct Parking South East Campus
Alteration
Results
$2,000,000 to $5,000,000 est. value
Mather, Rancho Cordova, CA 95655

AC Overlay Phase One
Infrastructure
Results
$7,900,000 est. value
Sacramento, CA

3S Apartments
Demolition, New Construction, Infrastructure - 2,300 SF
Construction
$71,500,000 CJ est. value
Sacramento, CA 95811

3S Apartments
Demolition, New Construction, Infrastructure - 2,300 SF
Construction
$71,500,000 CJ est. value
Sacramento, CA 95811

Sunrise Mall Redevelopment
New Construction, Infrastructure - 695,000 SF
Pending Verification
$400,000,000 CJ est. value
Citrus Heights, CA 95610

Sunrise Mall Redevelopment
New Construction, Infrastructure - 695,000 SF
Pending Verification
$400,000,000 CJ est. value
Citrus Heights, CA 95610

Workforce Development Center
Renovation
Conception
$10,000,000 est. value
Sacramento, CA 95811

Phan Apartment Homes At Sierra Vista Park
New Construction, Infrastructure
Design
$10,000,000 CJ est. value
Sacramento, CA 95823

Duckhorn Drive Safety Improvement Project
Infrastructure
Post-Bid
$470,000 est. value
Sacramento, CA 95834

Last Updated 07/10/2023 05:08 PM
Project Title

Oak Rose Apartments

Physical Address View project details and contacts
City, State (County) Elk Grove, CA 95624   (Sacramento County)
Category(s) Commercial, Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Office, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected March 2024
Bids Due View project details and contacts
Estimated Value $35,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of July 10, 2023 the project's timeline has been delayed due to litigation regarding the project. Information concerning a general contractor and construction start is not available. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

New Construction, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Cast-in-Place Concrete, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Entrances and Storefronts, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Carpeting, Painting and Coating, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 12 - Furnishings, Window Treatments, Casework, Rugs and Mats, Office Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents