Similar Projects
North Western Avenue / Mixed-Use
New Construction, Infrastructure
Design
$3,000,000 est. value
Chicago, IL 60618

Asphalt Parking Lot Removal & Replacement
Demolition, Alteration
Bidding
$300,000 est. value
Lansing, Tinley Park, IL 60438

Unpaved Trail Repairs and Improvements
Infrastructure
Bidding
$70,000 est. value
Chicago, IL

Community Athletic Fields Concrete ADA Ramp
Post-Bid
Elk Grove Village, IL

Removal and Replacement Existing Damage Sidewalk, Curb and Gutter
Post-Bid
Bartlett, IL

(2.5-Mile) SMART Overlay and ADA Improvements on Cermak Road from Kedzie Avenue to Halsted Street
Results
Chicago, IL 60600

(3.05-Mile) Standard Overlay and Pedestrian Ramp ADA Improvements
Results
Chicago, Oak Park, IL 60301

Upgrade Parking Lots, Roads and Walkways Chicago State University
Infrastructure
Bidding
$7,000,000 est. value
Chicago, IL 60628

Alsip Boat Launch East Parking Lot Improvements
Post-Bid
Chicago, IL

2021 Sidewalk Improvements
Results
Buffalo Grove, IL

Fullerton Avenue Resurfacing
Infrastructure
Bidding
$425,000 est. value
Northlake, IL 60164

Oak Forest HS and Tinley Park HS Parking Lot Improvements
Post-Bid
Oak Forest, Tinley Park, IL 60452

2020 Green Alley Program - Supplemental Alley
Results
$300,000 est. value
Lyons, IL

2022 Asphalt Parking Lot and Path Maintenance
Infrastructure
Bidding
$500,000 est. value
Orland Park, IL

Far South Parking Lot Improvements
Renovation
Post-Bid
IL

Last Updated 06/22/2022 11:25 PM
Project Title

2022 Sidewalk Program

Physical Address View project details and contacts
City, State (County) Maywood, IL   (Cook County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Notice is hereby given by the President and Board of Trustees of the Village of Maywood, Cook County, Illinois, that sealed bid proposals will be received for the following improvement: 2022 SIDEWALK PROGRAM This project includes replacement of approximately 3,500 square feet of concrete sidewalk at various locations throughout the village, as well as a nominal amount of replacement of concrete curb and gutter and concrete driveway apron.The Engineer has been authorized to refuse to issue plans, specifications, and proposals to any person, firm, or corporation that he considers to be unqualified. Proposals must be submitted on the forms provided. All bid proposals offered must be accompanied by a bid bond, cashier's check, or certified check in an amount which shall not be less than Five Percent (5%) of the total amount of the proposal. All bidders wishing to obtain bidding documents must be approved by the Village prior to obtaining bidding documents. All bidders must provide proof that they are prequalified with the Illinois Department of Transportation to perform at least 50% of the value of the work before being issued bidding documents. No bid shall be withdrawn after the opening of the Proposals without the consent of the President and Board of Trustees of the Village of Maywood for a period forty-five (45) days after the scheduled time of bid opening. The Contractor and Subcontractor shall comply with all regulations issued pursuant to Prevailing Wage Act (820 ILCS 130), and other applicable Federal Laws and regulations pertaining to labor standards. The successful bidder for the work will be required to furnish sufficient insurance to the Village of Maywood and the Engineer against all damage claims that might arise due to the negligence of the Contractor, and will be required to furnish a Performance Bond and a Labor and Material Payment Bond in the amount of the contract. The Village is using local funding for the completion of the project. The Village of Maywood reserves the right in receiving these bids to waive technicalities and reject any or all bids.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents