Similar Projects
900 South Reconstruction, Phase 2 900 West to Lincoln Street
Infrastructure
Bidding
$2,000,000 est. value
Salt Lake City, UT

2022 South Salt Lake City Crack Seal Project
Infrastructure
Bidding
South Salt Lake, UT

2020 Fall Crack Seal Project
Post-Bid
Sandy, UT 84070

SLC Airport PCC Pavement Joint Seal Program - Deicing Pad Taxiway
Post-Bid
Salt Lake City, UT

300 East (11400 South to 11800 South) Reconstruction Project
Results
Draper, UT 84020

2021 High Density Mineral Bond
Results
South Jordan, UT 84095

Paxton East Parking Lot
New Construction
Construction
$50,000 est. value
Salt Lake City, UT 84101

Fiber Reinforced Asphalt 2022
Infrastructure
Bidding
West Jordan, UT

Udot AVL (Approved Vendor List)- Hot Mix Asphalt
Term Contract
Post-Bid

4150 West From Majestic Rise Parkway to 12600 So New Capacity
Results
$4,000,000 to $6,000,000 est. value
UT

Asphalt Replacement, Playground, Dilworth Elementary
Infrastructure
Bidding
Salt Lake City, UT 84108

Deer Ridge Drive Reconstruction
Alteration
Post-Bid
$980,000 est. value
Draper, UT

Monroe and 90th Street (SR-209) Intersection Imp Intersection Modification
Results
$4,000,000 to $6,000,000 est. value
UT

Asphalt Replacement, Playground, Uintah Elementary
Infrastructure
Bidding
Salt Lake City, UT 84105

City-Wide Roadway Improvement Project
Infrastructure
Post-Bid
Cottonwood Heights, UT

Last Updated 02/09/2022 08:44 AM
Project Title

Local Streets Reconstruction 2022-1

Physical Address View project details and contacts
City, State (County) Salt Lake City, UT 84102   (Salt Lake County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,479,698
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work to be performed consists of furnishing and installing the equipment, facilities, services, and appurtenances indicated in the Contract Documents. The Work generally includes, but is not limited to, the following: street improvements (i.e. replacement of concrete flatwork, ADA ramps, and C&G; reclaimed aggregate with cement, replacement of pavement) and storm drainage upgrades. The location of the work is: 800 West Street from 600 South to 900 South and Industiral Avenue fron 2100 South to Associated Avenue in Salt Lake City.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents