Similar Projects
Amanda Rochell Elementary School Replacement
Renovation
Conception
Rockwall, TX 75032

New Elementary #8 Construction
New Construction
Conception
$44,200,000 est. value
Royse City, TX

The Horizon at Fate Main
New Construction, Infrastructure - 51,587 SF
Design
$4,850,000 CJ est. value
Rockwall, TX 75087

HG Supply Co Restaurant
New Construction, Infrastructure - 6,800 SF
Design
$2,000,000 CJ est. value
Rockwall, TX 75032

Royse City Independent School District (RCISD) Elementary School #7
New Construction, Infrastructure - 103,000 SF
Bidding
$10,000,000 CJ est. value
Royse City, TX 75189

Royse City Independent School District (RCISD) Elementary School #7
New Construction, Infrastructure - 103,000 SF
Bidding
$10,000,000 CJ est. value
Royse City, TX 75189

High School CTE Addition Site Package
Alteration
Post-Bid
Royse City, TX

Construction of Earthwork Improvements to Serve Magnolia, Phase 10
Infrastructure
Post-Bid
$800,000 CJ est. value
Royse City, TX 75189

Rockwall Technology Park Phase V Infrastructure
Infrastructure
Results
$20,000,000 to $25,000,000 est. value
Rockwall, TX 75032

Sabine Creek Wastewater System Sabine Creek Wastewater Treatment Plant - Expansion to 7 MGD
Addition, Demolition, Infrastructure
Results
$69,831,000 CJ est. value
Royse City, TX 75189

Herndon Elementary Expansion Project
Construction
Royse City, TX 75189

Miss May Vernon Elementary Expansion
Renovation, Addition
Construction
$9,000,000 est. value
Fate, TX 75132

Middle School #4 - 2021 Bond - Proposition A - Rockwall Independent School District
Renovation
Pending Verification
$43,000,000 CJ est. value
Rockwall, TX 75087

Platform Rockwall
New Construction, Infrastructure - 77,234 SF
Pending Verification
$17,000,000 CJ est. value
Rockwall, TX 75087

Pump Station 3 - City of Fate
New Construction, Infrastructure
Design
$6,750,000 CJ est. value
Fate, TX 75087

Last Updated 10/12/2022 02:11 PM
Project Title

RCISD Elementary School #7

Physical Address View project details and contacts
City, State (County) Royse City, TX 75189   (Rockwall County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Elementary School, Site Development
Contracting Method Construction Management - CM at Risk, Competitive Bids
Project Status Bidding, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $22,000,000 [brand] Estimate
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

A New 103,000 square-foot Elementary School. As of October 5, 2022, an architect andconstruction manager have been identified. A timeline for construction has not been confirmed.

Details

103,000 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents