Similar Projects
Penn Station Redevelopment
New Construction, Renovation, Alteration - 123,000 SF
Conception
New York, NY

Hawkinsville Dam Remediation
Renovation
Bidding
Boonville, NY 13309

Lake Suzanne Dam Rehabilitation Project
Renovation
Post-Bid
Spring Valley, NY

Fallkill Dam Rehabilitation Project
Renovation
Post-Bid
$1,000,000 to $1,300,000 est. value
Poughkeepsie, NY 12601

Beaver Creek Clean River Project - Phase III - Beaver Creek Diversion Tunnel
Results
Albany, NY 12207

Beaver Creek Clean River Project - Phase IV - Third Avenue Tunnel
Results
Albany, NY 12207

The Summit Center - Addition & Renovations
New Construction, Renovation, Addition - 16,500 SF
Construction
$2,000,000 to $2,300,000 est. value
Buffalo, NY 14228

Syracuse University Bird Library North Ventilation Tunnel Repair
Renovation - 2,500 SF
Construction
$18,850 est. value
Syracuse, NY 13210

NYRA - Belmont Park Tunnels
New Construction
Post-Bid
Elmont, NY 11003

Dam Rehabilitation Sal J. Prezloso Mountain Lakes Park
Results
$5,500,000 to $6,200,000 est. value
North Salem, NY 10560

Mount Morris Dam Hydraulic Rehab
Renovation
Post-Bid
$100,000 to $250,000 est. value
Mount Morris, NY 14510

Westside CSOAP Tunnel System Maplewood Siphon Improvements - Phase I
Results
Rochester, NY 14614

Mt. Morris Dam Bulkhead Fabrication
New Construction
Post-Bid
Mount Morris, NY

Playground Site Work Rehabilitation Kensico Dam Plaza, Mount Pleasant and North Castle New York
Results
$1,250,000 to $1,450,000 est. value
Valhalla, NY 10595

Belmont Park Tunnels
New Construction
Post-Bid
Elmont, NY 11003

Last Updated 04/11/2022 02:40 PM
Project Title

Vertical Lift Gate Recess Concrete Restoration

Physical Address View project details and contacts
City, State (County) NY 13662   (Saint Lawrence County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,000,000 to $5,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Contract to restore deteriorated concrete on vertical faces of the Eisenhower Lock vertical lift gate recess. The vertical lift gate recess is located adjacent to the upstream side of the miter gate sill approximately 50 to 100’ below the top of the lock wall working surface. The project includes all labor, materials and equipment to rehabilitate an estimated 3,350 square feet area of deteriorated concrete in the approximately 46’ wide by 80’ wide recess. The work comprises removal of unsound concrete and placing new concrete to restore original profiles. The contractor may use dry mix shotcrete application methods or conventional formed cast-in-place concrete. The work also includes the requirement to muck out accumulated debris and rubble at the bottom of the recess to expose concrete for restoration. The contractor shall provide all lights, heat, work platforms, materials and personnel access, water and all other utilities that are required for the work.

Details

Dam/Tunnel, Renovation.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 35 - Waterway and Marine Construction, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents