Similar Projects
River Road Multi Residential Development / Boerne
New Construction, Infrastructure
Conception
$18,000,000 CJ est. value
Boerne, TX 78006

Cascade Caverns Rd
Infrastructure
Conception
$9,425,844 CJ est. value
Boerne, TX 78015

HEB Fair Oaks Store / Boerne
New Construction, Infrastructure - 110,377 SF
Design
$24,604,487 CJ est. value
Boerne, TX 78006

Rebuild of Kendalia Feed Store
New Construction, Infrastructure - 2,588 SF
Design
$225,000 CJ est. value
Boerne, TX 78006

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Biedenharn Subdivision, Unit 1
Results
TX

Biedenharn Subdivision, Unit 1 and Unit 2
Results
$7,110,522 est. value
TX

A-Affordable Boat and RV Storage - Boerne - A-Affordable Storage
New Construction, Infrastructure - 26,750 SF
Construction
$5,000,000 CJ est. value
Boerne, TX 78006

Baptist Health System Acute Care Hospital and Medical Office
New Construction, Infrastructure
Pending Verification
$50,000,000 CJ est. value
Boerne, TX 78006

Buc-ee's / Boerne
New Construction, Infrastructure - 53,000 SF
Pending Verification
$40,000,000 CJ est. value
Boerne, TX 78006

FM 3351
Infrastructure
Conception
$11,900,000 CJ est. value
Boerne, TX 78006

Currey Creek Church Office Relocation
Addition, Demolition, Renovation, Infrastructure - 7,738 SF
Design
$1,800,000 CJ est. value
Boerne, TX 78015

Cordillera Ranch Unit 304 and Cordillera Springs Offsite Utility Lines
Infrastructure
Post-Bid
TX

San Marcos Aquatic Resources Center - Rehabilitation and Realignment of The Entrance Road
Term Contract
Results
$1,000,000 to $5,000,000 est. value
San Marcos, TX 78666

Last Updated 01/13/2023 07:03 PM
Project Title

Boerne Stage Road Phase II

Physical Address View project details and contacts
City, State (County) Boerne, TX 78006   (Kendall County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $9,629,193 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of the Boerne Stage Road Phase II Project is to rehabilitate the existing configuration by incorporating a new pavement section, operational improvements and necessary drainage improvements for approximately 1 mile from Cross Mountain to approximately 1,200 ft west of River Ranch Road. San Antonio Water System (SAWS), CPS Energy Gas, and Grey Forest Utilities will be joint bidding with Bexar County to adjust and/or replace existing services within the project limits. Question Deadline 12/20/2022 at 4:00 PM CT (CTS) through Q&A portal or to the Buyer/Contract Specialist, Jonathan Preiss, CTPM, jonathan.preiss@bexar.org (CC: dwegmann@bexar.org).

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents