Similar Projects
Land Improvement Building Number 1009965 Wolverine tower Plaza Renovation Bidpack 01 - Construction
Renovation
Post-Bid
Ann Arbor, MI

400 North Ingalls Building Building Number 1000333 Renovate Ne Wing First Floor Bidpack 01 - Construction
Renovation
Post-Bid
Ann Arbor, MI

Lurie Ann and Robert H Biomedical Engineering - First Floor Renovation
Renovation
Post-Bid
Ann Arbor, MI 48109

Life Sciences Institute Building Building Number 1005036 Renovations To Level 1 Cryo EM Imaging Suite bidpack 01 - Construction
Renovation
Post-Bid
Ann Arbor, MI

Institute for Social Research – Renovations on Floor 6
Renovation
Post-Bid
Ann Arbor, MI

Elevator Renovation - Mark-Jefferson Science Complex
Renovation
Post-Bid
Ypsilanti, MI 48197

Mott Childrens Von Voigtlander Womens Hospitals – Sophies Place – C and W Level 3
Post-Bid
Ann Arbor, MI

University Hospital Building Number 1000316 MRI Replacement UH B2 307 (Siemens 1.5T Magnet) Bidpack 01- Construction
Post-Bid
Ann Arbor, MI

Literature Science and the Arts – Second Floor Improvements – Phases 5 – 8
Post-Bid
Ann Arbor, MI

North Campus Research Complex Building 200 Building Number 1005277 Office Renovations Bidpack 01 - Construction
Renovation
Post-Bid
Ann Arbor, MI

Multiple Buildings Building Number 1080002 Nexus Burner Management System Upgrades Bidpack 01 - Construction
Post-Bid
Ann Arbor, MI

Multiple Blocks – Lot Nc83 Reconstruction
Post-Bid
Ann Arbor, MI

Multiple Buildings Building Number 1080002 Civil and Environmental Engineering Improvement Project Bidpack 01- Construction
Post-Bid
Ann Arbor, MI

University Hospitals – Cafe Dining Upgrade
Renovation
Post-Bid
Ann Arbor, MI

Flint William S White Building – Classroom Renovation
Renovation
Post-Bid
Ann Arbor, MI 48109

Last Updated 06/25/2020 08:54 AM
Project Title

South University Facade

Physical Address View project details and contacts
City, State (County) Ann Arbor, MI 48104   (Washtenaw County)
Category(s) Education
Sub-Category(s) College/University
Contracting Method
Project Status Permitting, Construction Complete as of December 2019, Construction Start Expected July 2019
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

1 College/University, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents