Similar Projects
Flooring Replacement
Alteration
Bidding
$130,000 est. value
Holyoke, MA 01040

Lawrence Library Floor Finishes Replacement
Alteration
Bidding
Lawrence, MA 01841

Flooring Installation at Kiley Middle School
Post-Bid
$40,000 est. value
Springfield, MA

LVP Flooring
Post-Bid
Less than $21,864 est. value
Saugus, MA

Authority Wide Terrazzo Repairs Term Contract
Term Contract
Results
Less than $150,000 est. value
Boston, MA

Costello Basketball Suite Project - Filed Sub-Bids
Results
$3,000,000 est. value
Lowell, MA

Flooring Replacement and Related Work
Alteration
Bidding
Less than $200,000 est. value
Wellesley Hills, MA

Storm and Sanitary Line Replacement at Bellflower Development - Filed Sub-Bid
Post-Bid
Less than $1,248,641 est. value
Dorchester, MA

Worcester Challenge and Reach Academy Window/Door/Roof and Boiler Replacement - Sub-Bids
Results
Less than $4,800,000 est. value
Worcester, MA 01609

Refinishing Gymnasium Floors Various Schools Wet Screening
Alteration
Bidding
$26,000 est. value
Chicopee, MA

Install Flooring at Butler Elementary School Cafeteria
Post-Bid
Less than $45,000 est. value
Belmont, MA 02478

Gym Floor Replacement at the Greater Lawrence Technical High School
Results
Less than $515,000 est. value
Andover, MA 01810

Removal of Existing Carpet and Installation of VCT/2nd Floor Classrooms
Alteration
Bidding
$80,000 est. value
Chicopee, MA

Goessmann Hall 2nd Floor Renovation Project - Filed Sub Bids
Post-Bid
Less than $11,200,000 est. value
Boston, MA 02108

LOC First and Second Floor Office Renovations - Filed Sub Bids
Results
Less than $2,600,000 est. value
East Boston, MA

Last Updated 06/01/2021 09:01 AM
Project Title

Replace Common Hallway Flooring in Buildings 2 and 3

Physical Address View project details and contacts
City, State (County) Adams, MA 01220   (Berkshire County)
Category(s) Single Trades
Sub-Category(s) Flooring
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $78,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of: Remove the existing carpet and wall base in the main hallways in building 2 and 3 and replace with carpet tile and coved vinyl wall base. Asbestos abatement will include carpet & adhesive, floor tile & mastic, wall base & mastic removal.

Details

Division 09 - Finishes, Flooring.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents