Similar Projects
Tohono O'odham Nation - Integrated Fixed Tower (Ton Ift) Project Road And Site Preparation
Design
$10,000,000 to $25,000,000 est. value
Tucson, AZ 85746

Route N16-Inscription House
Post-Bid
Window Rock, AZ

Construct N12(19-4)1,2 and 4 Road Improvement Project
Post-Bid
Tsaile, AZ

Median Islands - University Drive from College Avenue to Veterans Way
Results
Tempe, AZ

VA Tucson Resurface Roads
Results
$1,000,000 to $2,000,000 est. value
Tucson, AZ

Attesa Motorsports Complex Phase 1
New Construction
Construction
Casa Grande, AZ

Valencia East Extension
New Construction
Construction
$16,000,000 est. value
Tucson, AZ 85747

Y--Haekel Road Chipseal
Post-Bid
Safford, AZ

Design and construct general purpose lane
Results
AZ

Annual Contract for Supplying Various Roadway Materials
Term Contract
Post-Bid
Holbrook, AZ

Pavement Rehabilitation and Upgrade Sidewalks
Results
Less than $442,000 est. value
Globe, AZ

Kayenta Shopping Center
Term Contract
Post-Bid
Kayenta, AZ 86033

System Enhancement (Other Enhancements)
Results
Less than $2,580,000 est. value
Apache Junction, AZ 85119

Paving for Church Rock Industrial Park
Post-Bid
Fort Defiance, AZ

System Preservation (Engineering)
Results
Less than $31,500,000 est. value
AZ

Reported 02/11/2019 05:45 AM
Project Title

Asphalt Cold Patching Materials; Upm, Aquapatch and Aquaphalt Bulk and Bagged

Physical Address View project details and contacts
City, State (County) State-Wide: AZ
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description Requirement for High-Performance Asphalt Cold Patching Materials; Unique Paving Materials (UPM), and cold mix water activated asphalt patch materials AquaPhalt and AquaPatch for plant pick-up and/or delivery to ADOT Maintenance Yards located throughout the State of Arizona.
Details
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents