Similar Projects
Airfield Paving Construction MATOC
Post-Bid
Less than $400,000,000 est. value

Hotchkiss Road Hot Mix Asphalt & Shouldering
Post-Bid
Strum, WI 54770

Road and General Construction Multiple Award IDIQ for the Chequamegon-Nicolet NF
Results
$5,000 to $7,000,000 est. value

Galesville - Whitehall, STH 95 East Junction
Results
Galesville, Whitehall, WI 54630

Thompson Road Hot Mix Asphalt & Shouldering
Renovation
Post-Bid
Strum, WI

Centerville - Independence, STH 35 to Swenson Lane
Results
Centerville, Independence, WI

Thompson Road Improvements
Post-Bid
WI

Road Improvements
Results
Eleva, WI

Local Road Improvement Project (LRIP)
Infrastructure
Post-Bid
Ettrick, WI 54627

2021 Street and Utility Improvements
Results
$750,000 est. value
Strum, WI

2021 Road Work
Infrastructure
Post-Bid
Dodge, WI

Statewide Pavement Maintenance 2021-2022
Term Contract
Results
Less than $5,000 est. value

Osseo 5th St Neighborhood Revitalization CDBG-PF Improvements
Results
Osseo, WI 54758

Trempealeau - Fountain City, Tremp River E. Channel Bridge
Results
Fountain City, Trempealeau, WI

2021 Town Road Improvement - Eide Lane
Results
Eleva, WI 54738

Last Updated 12/06/2021 10:47 AM
Project Title

2021 Asphalt Paving/Curb and Gutter

Physical Address View project details and contacts
City, State (County) Trempealeau, WI 54661   (Trempealeau County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

A. Jay St. – 2nd to 3rd, Area: 340' X 20' B. Spring St. – 1st to 2nd, Area: 235' X 20' Saw cut, pulverize, remove subsoils, widen and ensure 6" of compacted base course, finish shape base course. Furnish and install 2½" of compacted hot mix asphalt. Contractors shall pulverize and rough grade to ensure proper storm water drainage. Contractor is also responsible for all erosion control until street is paved. Curb and Gutter A. Jay St. – 2nd to 3rd, 680 L.F. of 24" curb and gutter B. Spring St. – 1st to 2nd, 470 L.F. of 24" curb and gutter* *Option for additional 64 L.F. of curb & gutter along south edge of 2nd Street.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents