Similar Projects
Water Project
Post-Bid
Less than $166,000 est. value
Nashville, AR

North Locust Street 20 Water Main Installation
Infrastructure
Bidding
North Little Rock, AR 72115

Raw Water Supply Transmission Pipeline Contract 5
Results
Less than $11,200 est. value
Hot Springs, AR

Wastewater System Improvements
Infrastructure
Post-Bid
Lake City, AR

Brookland Hills Sewer Extension - Phase I
Infrastructure
Bidding
Brookland, AR

Highway 37 Utility Relocation
Infrastructure
Post-Bid
Tuckerman, AR

The East End 2021 Water Improvements Contract - 2 Water Line Improvements
Infrastructure
Bidding
North Little Rock, AR 72100

Water Quality Demonstration
Results
Less than $1,412,520 est. value
Conway, AR 72032

Raw Water Supply Transmission Pipeline Contract 3
Infrastructure
Bidding
Hot Springs, AR

Highway I-49 18 Water Main Extension
Infrastructure
Post-Bid
Rogers, AR

Construction of the Highway 141 Water Line Relocation
Infrastructure
Post-Bid
Paragould, AR

Stone Links - Multi-Pipe Maintenance Rehabilitations
Infrastructure
Results
North Little Rock, AR

Dierks Water and Sewer Improvements
Infrastructure
Bidding
$165,000 est. value
Dierks, AR

Highway 9 Water Line Relocation
Results
Salem, AR

Water System Improvements: Contract II - Water Line Extension and Chlorination Facility
Post-Bid
El Dorado, AR

Last Updated 06/23/2021 10:51 AM
Project Title

Construction – 2021 Waterline Improvements

Physical Address View project details and contacts
City, State (County) Fayetteville, AR   (Washington County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $5,250,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The project includes, but not limited to, the construction of approximately 1,890 linear feet of 8” waterline along Huntsville Rd. from Mill Ave. to Mashburn Ave., 1,250 linear feet of 8” waterline along Ila St. from Wilson Ave. to Lincoln Ave. and 690 feet of 8” waterline along Shady Ave. from Maple St. to Louise St., 1,950 linear feet of 8” waterline along oaks Manor Dr. from Rolling Hills Dr. to Sheryl Ave., 820 linear feet of 12” waterline along Persimmon St. from Betty Jo Dr. to Shiloh Dr., and 3,345 linear feet of 8” waterline and 890 linear feet of 4” waterline within the Western Park trailer park including off-site connections to the east

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents