Similar Projects
Wendell Place Apartments
New Construction
Conception
Wendell, NC

Zero Slater Road
New Construction - 137,500 SF
Conception
$10,000,000 CJ est. value
Morrisville, NC

Hampton Spring
New Construction
Design
Raleigh, NC

Capitol Boulevard Mixed Use
New Construction - 1,700,000 SF
Design
Raleigh, NC

Legacy Heritage
New Construction
Post-Bid
Wake Forest, NC

Weston Lakeside
Renovation - 27,797 SF
Post-Bid
Cary, NC 27513

Morrisville Town Center Core - Phase I
New Construction - 277,300 SF
Results
$13,000,000 to $44,400,000 est. value
Morrisville, NC

Request for Qualifications & Proposals for an Architect (RFQ) & Civil Engineer (RFP)
New Construction
Results
Raleigh, NC 27610

Davis Drive Apartments
New Construction - 107,950 SF
Construction
$15,000,000 est. value
Morrisville, NC

Walnut Trace
New Construction
Construction
Raleigh, NC

Morrisville Town Center Core - Phase 1
New Construction
Pending Verification
Morrisville, NC 27560

Fenton - Mixed-Use Development
New Construction - 508,400 SF
Pending Verification
$10,000,000 CJ est. value
Cary, NC 27511

Abbey Spring
New Construction
Conception
Apex, NC 27502

Wakefield Apartments
New Construction
Design
$1,000,000 to $5,000,000 CJ est. value
Raleigh, NC 27614

Request for Proposal for a General Contractor to Act as a Construction Manager at Risk
New Construction
Post-Bid
$14,000,000 est. value
Raleigh, NC 27610

Reported 07/20/2022 12:00 AM
Project Title

Cornerstone Building Renovation

Physical Address View project details and contacts
City, State (County) Raleigh, NC 27603   (Wake County)
Category(s) Residential
Sub-Category(s) Apartments/Condominiums
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs), Construction Start Expected August 2022,
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

The Cornerstone Building is an existing three-story, 15,420 sf structure originally built in 1901 and last renovated in 1985. the ground level currently houses public client and secure staff program. The second and third levels house a total of 18 resident apartments--nine units per floor. This renovation will include the following: new ground floor entry spaces, multi-purpose room, open office, and admin offices; new fixtures and finishes in public restrooms; relocated client exam rooms; reconfiguration of existing ground floor resident apartments to be ADA accessible; new kitchenettes, showers, fixtures and accessories at upper-level apartments; and updated finishes and paint throughout. To support the above modifications, scope of MEP work includes the following: separation of hydronic water from the sprinkler system; new hydronic piping; boiler and pump replacement at the basement level; closed circuit cooler replacement; toilet exhaust equipment replacement; water-source heat pump replacement throughout; new DDC control system; modification of power, fire protection, plumbing, HVAC, lighting, and fire alarm systems as needed.

Details

Apartments/Condominiums, 3 Stories Above Grade, 15,420 SF Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents