Similar Projects
Barren Road Multi-Residential Development
New Construction, Infrastructure
Conception
$65,000,000 CJ est. value
Pooler, GA 31322

Barren Road Multi-Residential Development
New Construction, Infrastructure
Conception
$65,000,000 CJ est. value
Pooler, GA 31322

Hotel Anne
New Construction, Infrastructure - 41,000 SF
Design
$10,000,000 CJ est. value
Savannah, GA 31401

Hotel Anne
New Construction, Infrastructure - 41,000 SF
Design
$10,000,000 CJ est. value
Savannah, GA 31401

Widening and Reconstruction on US 80/SR 26 (Ogeechee Rd)
Infrastructure
Bidding
$58,736,853 CJ est. value
Savannah, GA 31405

Widening and Reconstruction on US 80/SR 26 (Ogeechee Rd)
Infrastructure
Bidding
$58,736,853 CJ est. value
Savannah, GA 31405

T32 - District 5 Routine Maintenance Services
Infrastructure
Post-Bid
Baconton, Evans, GA 30809

Convention Center Hotel Development
New Construction, Infrastructure - 160,000 SF
Post-Bid
$4,000,000 CJ est. value
Savannah, GA 31401

8.610 Miles of Milling, Inlay, Plant Mix Resurfacing and Shoulder Rehabilitation on SR 204
Infrastructure
Results
GA

Lansing Avenue Traffic Calming / Central Avenue Rehabilitation
Infrastructure
Results
Savannah, GA 31406

JC Lewis Ford Dealership
New Construction, Infrastructure
Construction
$12,400,000 CJ est. value
Pooler, GA 31322

CenterPoint Logistics Park
New Construction, Infrastructure
Construction
$35,000,000 CJ est. value
Garden City, GA 31408

SeaPoint Industrial Terminal Complex
New Construction, Infrastructure
Pending Verification
$15,000,000 CJ est. value
Savannah, GA 31404

SeaPoint Industrial Terminal Complex
New Construction, Infrastructure
Pending Verification
$15,000,000 CJ est. value
Savannah, GA 31404

Stop N Store - Bloomingdale
New Construction, Infrastructure - 82,000 SF
Conception
$8,000,000 CJ est. value
Bloomingdale, GA 31302

Last Updated 03/27/2023 12:08 PM
Project Title

63 MLK Hotel

Physical Address View project details and contacts
City, State (County) Savannah, GA 31401   (Chatham County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Hotel/Motel, Parking Garage, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation
Project Status Design Development, Construction start expected October 2024
Bids Due View project details and contacts
Estimated Value $40,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The hotel will feature two stories of underground parking and have a footprint of nearly 27,000 square-feet. As of March 27, 2023, the construction documents will be permitted in fall 2023. This project went before the Historic District Board of Review on November 9, 2022 to request approval for amendments to a previously approved Certificate of Appropriateness. An architect and a negotiated general contractor have been selected. However, the negotiated general contractor's identity has not yet been disclosed. Construction is expected to start in fall of 2024.

Details

6 Stories Above Grade, 208,680 SF. 2 Stories Below Grade, New Construction, New Construction.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Structural Concrete, Precast Concrete Slabs.
Division 04 - Masonry, Unit Masonry, Concrete Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows, Mirrors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Flooring, Resilient Flooring, Carpeting, Wall Coverings, Acoustic Treatment, Painting.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Flagpoles.
Division 11 - Equipment, Vehicle and Pedestrian Equipment, Commercial Laundry and Dry Cleaning Equipment, Maintenance Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Window Blinds, Curtains and Drapes, Casework, Furnishings and Accessories, Hospitality Furniture.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Medium-Voltage Electrical Distribution, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Voice Communications, Call Management.
Division 28 - Electronic Safety and Security, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents