Similar Projects
Last Updated | 01/23/2023 06:33 AM |
Project Title | Concrete Pads and Conduits |
Physical Address | View project details and contacts |
City, State (County) | Topeka, KS 66612 (Shawnee County) |
Category(s) | Government/Public, Heavy and Highway |
Sub-Category(s) | Misc. Buildings, Site Development |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected February 2023 |
Bids Due | View project details and contacts |
Estimated Value | $79,849 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Topeka Metropolitan Transit Authority (Metro) is requesting bids from qualified contractors to construct concrete pads and install conduits and low voltage conductors at our Ryan Administration Building location at 201 N. Kansas Avenue in Topeka, KS. This project is in preparation for some electrical work to be conducted by Evergy. Evergy will need to approve the concrete pad location sites, the condition and dimensions of the concrete pads, and the conduit opening conditions and dimensions . This is a single-job contract. Davis-Bacon reporting requirements must be completed each week. The most recent DavisBacon wage rates for building projects in the State of Kansas are attached (Appendix I). The contractor is responsible for complying with Davis-Bacon wage rates and postings as required. The worksite posting is attached (Appendix II). Contract must be complete April 1, 2023. Allowances for obtaining permits and tax-exempt certificates, processing change orders and rain delays have been incorporated into the schedule. Contractor should show steady progress throughout the term of the contract If you have any questions concerning this Request, or if you need clarification or additional information, please contact: Richard Appelhanz 785-730-8621 rappelhanz@topekametro.org Questions must be received by Metro by Wednesday, December 14, 2022. Topeka Metro's current DBE goal is 1.62%. There is no DBE goal for this contract. If your firm is a DBE, or if you will be sub-contracting with a DBE, please attach a copy of the current DBE certificate. |
||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |