Similar Projects
AI Influent Pump Station Improvements
New Construction
Design
Less than $2,900,000 est. value
Saint Augustine, FL 32080

Construction Manager at Risk Services for Pump Station 5 and Proctor Road
Renovation
Bidding
Sarasota, FL 34249

Utilities Pump Station Improvements Package 34
Renovation
Bidding
$2,315,584 est. value
Orlando, FL

City Of Lynn Haven Push Button Maintenance, Repair and Minor Construction Contract
Post-Bid
Lynn Haven, FL 32444

Improvements To Lift Stations 393, 1023 And 8168
Renovation
Post-Bid
Belle Glade, West Palm Beach, FL

Replace Sewer Lift Station at USCG Station Panama City, Florida
Results
$250,000 to $500,000 est. value
Panama City, FL 32408

Detroit Boulevard Lift Station 50
Results
Less than $2,500,000 est. value
Pensacola, FL 32514

Tierra Verde Lift Station
New Construction
Construction
Tierra Verde, FL 33715

Effluent Disposal Project
Construction
Chipley, FL

Southwest Wastewater Service Area Master Pump Station
New Construction
Bidding
$1,500,000 to $2,000,000 est. value
Okeechobee, FL 34974

Improvements to Master Repump Station 9-North WUD
Post-Bid
$3,200,000 est. value
West Palm Beach, FL

Lift Station #48 Rehabilitation and Force Main Replacement
Results
Less than $300,000 est. value
Cooper City, FL 33329

Lift Station No. 20 Replacement
Renovation
Construction
$1,737,000 est. value
Palm Beach Gardens, FL

Prequalification of Sanitary and Storm Pump Station Vendors
New Construction, Infrastructure
Bidding
Palm Beach, FL

Clark Street Lift Station Rehab
Renovation
Post-Bid
Perry, FL 32347

Last Updated 12/06/2021 10:53 AM
Project Title

Rehabilitation of Pump Station A

Physical Address View project details and contacts
City, State (County) North Miami, FL 33168   (Miami-Dade County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,307,300
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Demolish the existing odor control device, ducts, blower, electrical connections, and appurtenances; remove existing chain link fence, gates, doors, hose bibs, valve box, and mill & resurface existing parking lot; remove hoist, piping, handrail, existing ventilation system, and saw cut concrete slab inside pump station building; remove frame & door on the north side of grade-level room inside building; remove existing ship ladder, check valves, pump bases, and wall braces inside dry pit; and remove existing safety switches, panels, pull boxes, and conduits throughout the station

Details

Lift and Pump Stations, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents