Similar Projects
Roof Replacement of Sections B, B2, C, C2, C3 and Y2 at Sparks High School
Renovation
Sub-Bidding
$2,163,082 CJ est. value
Sparks, NV 89431

Hangar F Roof Coating
Alteration
Post-Bid
$47,000 est. value
Reno, NV 89502

Roof Replacement on Mobile Classroom Buildings at Smithridge Elementary School and North Valleys High School
Alteration
Post-Bid
$125,000 est. value
Reno, NV 89502

Fire Station 3 - Roof Replacement
Alteration
Results
$115,000 est. value
Reno, NV

Fire Station 4 - Roof Repair
Alteration
Results
$100,000 est. value
Reno, NV 89503

Reno-Sparks Convention Center Sections D3 and U1 Roof Refurbishment
Alteration
Post-Bid
$1,000,000 est. value
Reno, NV 89502

Paradise Park Community Center - Roof and Siding Replacement
Alteration
Results
$110,000 est. value
Reno, NV 89512

Kid's Kottage 2 Roof Replacement Project
Renovation
Post-Bid
$325,000 CJ est. value
Reno, NV 89502

Roof Replacement at Lloyd Diedrichsen Elementary School
Alteration
Results
$274,000 est. value
Sparks, NV 89434

District-Wide Emergency Roof Repair and Roof Maintenance Repair Services
Term Contract
Post-Bid
Reno, NV 89501

Unr - Design and Replace Roof at Cashell Fieldhouse/Sports Medicine Complex
Term Contract
Results
$350,000 to $450,000 est. value
Reno, NV 89557

Remove and Replace Roofing Buildings 1A and 12
Infrastructure, Renovation
Post-Bid
$2,000,000 CJ est. value
Reno, NV 89502

Roof Replacement at Spanish Springs High School
Alteration
Results
$1,962,000 est. value
Sparks, NV 89441

Replace Roofs at Agricultural Education Building and Renewable Resource Center
Renovation
Post-Bid
$694,000 CJ est. value
Reno, NV 89501

Roof Replacement at Glenn Duncan Elementary School
Alteration
Results
$1,288,000 est. value
Reno, NV 89512

Last Updated 01/10/2023 03:06 AM
Project Title

Roof Replacement of Sections B1 and B4 at Galena High School

Physical Address View project details and contacts
City, State (County) Reno, NV 89511   (Washoe County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $2,129,000 [brand] Estimate
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

All questions shall be submitted in writing directly to WCSD's Solicitations website at http://solicitations.washoeschools.net/ or via e-mail to solicitations@washoeschools.net by 5:00 p.m. (Local Time) on December 21, 2022 Scope of Work: Remove existing roof system down to existing lightweight concrete, install temporary roof membrane, gypsum cover board mechanically fastened into existing steel deck, and PVC single-ply membrane system and associated finishes. Roof Replacement of Sections B1 and B4 at Galena High School

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents