Similar Projects
P-1049, Design-Build, Wallops Island Power Quality Upgrade at JEBLCFS Wallops Island, VA
Post-Bid
$10,000,000 to $25,000,000 est. value
Wallops Island, VA

N--Switchgear Refurbish and Replacement
Post-Bid
Radford, VA 24143

Conmy Hall Lighting and Audio Upgrade
Results
Arlington, VA 22211

62--VACO Studio Lighting Upgrade - B/V (VA-19-00054421)
Results
Arlington, VA 22202

Burrows-Burleson Tennis Center Lighting
Post-Bid
Blacksburg, VA

HVAC-R, Electrical, Plumbing, and Gas Fittings
Term Contract
Results
Blackstone, VA 23824

Unit 1 and 2 Turbine/Generator Rehab at Philpott Powerhouse in Basset, VA
Post-Bid
$10,000,000 to $25,000,000 est. value
Bassett, VA 24055

Lighting Mast Renovations
Results
Dahlgren, VA 22448

BPAT Lighting Upgrade
Post-Bid
Roanoke, VA

On-Demand Trade Services - Electrical
Term Contract
Results
Harrisonburg, VA 22807

Pond Lighting and Fountain System
Post-Bid
Newport News, VA

Mission Critical Maintenance and Repair Services
Term Contract
Results
$421,011 est. value
Arlington, VA 22201

Electrician Services
Term Contract
Post-Bid
Christiansburg, VA

Install Backup Generators at Deep Creek and South Mills, Chesapeake, Virginia and North Carolina
Results
$100,000 to $250,000 est. value
South Mills, NC - Chesapeake, VA 23323

Oakwood AHQ Shop HVAC-Lighting Replacement
Post-Bid
Richmond, VA 23219

Last Updated 10/28/2021 02:59 PM
Project Title

Gate Security and Solar Power Equipment Installation

Physical Address View project details and contacts
City, State (County) Woodford, VA 22580   (Caroline County)
Category(s) Single Trades
Sub-Category(s) Electric, Fencing
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value Less than $25,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Contractor shall provide all travel, labor, materials, tools, parts, and equipment necessary to complete the Gate security and solar power equipment installation. This project has the following major components. - Replacement of a slide gate opener and associated solar power equipment - Installation of a new solar powered security light - Installation of new solar powered lighting for facility entrance signs - Electrical work and solar power equipment installation

Details

Division 26 - Electrical, Battery Equipment, Batteries, Static Uninterruptible Power Supply.
Division 32 - Exterior Improvements, Fences and Gates.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents