Similar Projects
Welding Shop Electrical Upgrade
Bidding
Tarboro, NC 27886

Furnish and Deliver GE LED Flood Light Fixtures
Post-Bid
Rocky Mount, NC

RMFD Electrical and Plumbing Upgrades
Post-Bid
Rocky Mount, NC 27802

Wastewater Treatment Plant Electrical Improvements
Results
Rocky Mount, NC 27804

Highway 97 Lift Station - Motor Control Panel Replacement
Results
Less than $115,488 est. value
Rocky Mount, NC 27801

NCDMV SE Main Street Boring
Post-Bid
Rocky Mount, NC

Transmission Pole Change
Results
Less than $66,000 est. value
Rocky Mount, NC

Testing and Repair of Hydroelectric Generator Governor Systems at Hydroelectric Facilities for the U.S. Army Corps of Engineers
Post-Bid

Furnish, Deliver and Install Tubular Steel Poles
Results
Less than $6,596 est. value
Rocky Mount, NC

Annual Preventative Maintenance on City Owned Generators
Term Contract
Post-Bid
Rocky Mount, NC 27802

Alorica Switch Gear Upgrade
Results
Rocky Mount, NC 27804

Substation 230 KV Autotransformer
Post-Bid
Rocky Mount, NC 27804

Electric Transformers 2500kva
Results
Rocky Mount, NC

Electric Transformers 1500KVA
Post-Bid
Rocky Mount, NC 27802

Ceiling, Walls, HVAC and Electrical Repairs - Edgecombe County Courthouse
Results
Tarboro, NC 27886

Last Updated 02/21/2020 01:35 PM
Project Title

Sutton Road H-Frame Transmission and Distribution Installation

Physical Address View project details and contacts
City, State (County) Rocky Mount, NC   (Edgecombe County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $104,176
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1. Installation of 3. 85-foot steel transmission poles 10.5 foot deep per pole with rock at approximately 7 foot below ground. 2. Installation of 1. 85-foot steel transmission pole with no anticipated rock at location. Duke Energy has a three-phase feeder circuit on pole which will remain energized but spread for installation of new 85 foot transmission pole. All other circuits will be de-energized. 3. Installation of four distribution underground feeder circuits out of substation. Approximately 1500 feet of 750 MCM underground aluminum primary. Substation will be de-energized. 4. Installation of 16. 600 Amp Disconnect Switches 5. Installation of approximately 2500 feet of de-energized transmission 1272 AAC wiring and static wire. 6. Installation of approximately 4000 feet of de-energized distribution primary feeder 336 ACSR wiring 7. Removal of two 45-foot distribution primary pole and de-energized primary conductor all conduit should be removed above 2-foot subgrade. 8. Removal of 9000 feet of de-energized transmission and distribution primary conductor and top four poles over energized Duke Power primary feeder three phase circuit. 9. The Contractor awarded the contact shall be responsible for transferring all de-energized transmission primary conduct, static wire, guying and installation of new anchoring as needed for this project. 10. The Contractor awarded the contact shall be responsible for transferring all energized distribution primary, neutral conduct, guying, anchoring, transformers, secondary and lights as needed for this project. 11. The Contractor awarded the contact shall be responsible for transferring all communication wiring that's not deemed complex by Energy Resources representative without additional cost. Cost should be included in the total project post. 12. The Contractor awarded the contact shall be responsible for landing, making connections, and terminating all transmission and distribution conduct on this project.

Details

Division 26 - Electrical.
Division 33 - Utilities, Electrical Utility Transmission and Distribution.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents