Similar Projects
Water Well and Yard Hydrant Installation
Post-Bid
Rochester, MI 48306

Meter Maintenance
Post-Bid
Clinton Township, MI

2018 Phase V Service Line Replacement
Results
Flint, MI

Street and Utility Improvements - Washington Street and Dye Street
Results
Less than $1,362,523 est. value
Ionia, MI

Drop Shaft and Connecting Sewer Rehab-ST-S-4, ST-S-5 and UT-S-1
Post-Bid
Clinton Township, MI

Lakewood Boulevard Water Main Replacement River Avenue To Beeline Road
Results
Less than $1,465,569 est. value
Holland, MI

Grinder Pump Installs and Sanitary Sewer Repairs
Term Contract
Post-Bid
Brighton, MI 48114

Michigan Avenue Water Main Replacement
Results
Marshall, MI

Contracting Services to Provide Complete Cross Connection Control Program
Post-Bid
MI

2019-20 Pavement Reconstruction and Water Main Repalcement Project
Results
Huntington Woods, MI

Municipal Water Supply Well Drilling
Post-Bid
Cadillac, MI

TRI-A Subdivision Watermain Replacement
Results
Less than $865,958 est. value
Walled Lake, MI

Walnut Lake 1 Force Main Extension Project
Post-Bid
Pontiac, MI

2019 Lead Service Replacement
Results
Kalamazoo, MI 49007

Two (2) Years – Hydrant, Grate and Manhole Cover Parts
Term Contract
Post-Bid
Flint, MI

Last Updated 12/18/2020 11:36 AM
Project Title

Water Supply System Improvements - Andrews Mobile Home Park

Physical Address View project details and contacts
City, State (County) Otsego, MI   (Allegan County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $111,579
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of furnishing all material and constructing the following: • Abandoning 2 private water wells • Installation of 2” water service, new meter pit, meter, backflow preventor and pressure reducing valve • Installation of 35 new water service lines to individual mobile homes

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents