Similar Projects
Performing Arts Centers (PAC) Window Seal Replacement
Renovation
Sub-Bidding
$100,000 CJ est. value
Raleigh, NC 27601

Screen Door Replacement
Renovation
Sub-Bidding
$900,000 CJ est. value
Goldsboro, NC 27530

Doors and Installation for Commons Recreation Center
Alteration
Post-Bid
Jacksonville, NC

Window and Door Replacement at Caswell Center
Alteration
Post-Bid
Kinston, NC 28504

G W Carver Elementary and West Edgecombe Middle Window Replacement
Alteration
Results
Pinetops, NC 27864

Roll-Up Door Inspection and Maintenance Services
Term Contract
Results
Raleigh, NC

Fleet Management Overhead Door Replacement Project
Renovation
Sub-Bidding
$100,000 CJ est. value
Durham, NC 27704

Z1DZ--Automatic Door Repair and Inspection Services
Term Contract
Post-Bid
Durham, NC 27705

Overhead Steel Rolling Doors, Port of Morehead City
Alteration
Results
Morehead City, NC 28557

Preventative Maintenance on Durham County Detention Center Doors
Term Contract
Sub-Bidding
Durham, NC 27701

House 101 Doors and Vinyl Window Replacement
Alteration
Post-Bid
Kinston, NC 28504

Storefront Project Secondary Doors
Alteration
Results
$9,386 est. value
Aurora, NC 27806

Doors and Installation for Commons Recreation Center - 3rd Rebid
Renovation
Sub-Bidding
$400,000 CJ est. value
Jacksonville, NC 28546

Grey Building Window Replacements
Alteration
Post-Bid
$130,000 est. value
Winston-Salem, NC 27127

New Door at Room 117
Alteration
Results
$50,000 to $75,000 est. value
Fayetteville, NC 28301

Last Updated 03/11/2023 04:07 AM
Project Title

Interior Door Replacement

Physical Address View project details and contacts
City, State (County) Lincolnton, NC 28092   (Lincoln County)
Category(s) Single Trades
Sub-Category(s) Windows/Doors
Contracting Method Competitive Bids
Project Status Results, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $1,088,188 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Replace interior door slabs with Solid Core Wood Doors. (900+ Doors) Paint existing hollow metal and wood door frames. Sealed proposals will be received by the LINCOLNTON HOUSING AUTHORITY for CAPITAL FUND PROJECT NC 70-50120 & NC 70-50121 until 4:00 PM, TUESDAY, JANUARY 31, 2023, and immediately thereafter publicly opened and read for the furnishing of labor, material and equipment entering into the Modernization of Project NC 70-50120 & NC 70-50121. Scope of work will consist of renovations and modernization of existing project and includes, but is not limited to, the following items: o At Project NC 70-2: Replace existing door slab and hardware at bedroom, walk-in closet and bathroom, unless otherwise noted. Replacement doors to be painted, solid core, wood doors with new hardware. Paint existing hollow metal door frames. o At Project NC 70-2: All other doors to remain; unless otherwise noted. o At Project NC 70-3: replace existing door slab and hardware at all locations shown on plans, unless otherwise noted. Replacement doors to be painted, solid core, wood doors with new hardware. Paint existing wood door frames and wood door casing. o Provide all other work as shown on plans, in the project manual and as required by building codes and the authority having jurisdiction. Questions that arise from the Site Visits are to be directed to the Architect at bids@stognerarchitecture.com. All contractors are hereby notified that they must have proper license under the State laws governing their respective trades, whether or not Federal Funding is involved. North Carolina's Permanent Rules for the Lead Based Paint Hazard Management Program for Renovation, Repair and Painting (LHMP-RRP); 10A NCAC 41C.0900, became effective 11-01-2010. These rules and the associated General Statutes REQUIRE Certification of Prime Contractor, Renovators, Dust Sampling Technicians and firms conducting renovation, repair and painting for compensation that disturbs lead based paint in housing or child occupied facilities built before 1978. The Buildings in this contract have a (DOFA) Date of First Availability of: NC 70-2: 1973 NC 70-3: 1984 The Buildings in this contract have not been tested in accordance with North Carolina's LHMP-RRP rules; This Contract my involve a disturbance of the minimum amount of painted surfaces and based on the RRP Rules the Prime Contractor is REQUIRED to be Certified prior to bidding or the bid may be rejected. TEST PRIOR TO JULY 1997 DO NOT COMPLY WITH NC RULES. Provide a copy of Prime Bidder's Firm Certification; CERTIFICATION must be by State of North Carolina (NOTE: EPA Certification is not accepted in North Carolina). Contractors are notified that Chapter 87, Article 1, General Statutes of North Carolina will be observed in receiving and awarding Contracts. Contractors will be responsible to ensure that economic opportunities, to the greatest extent feasible follow Section 3 Requirements 24 CFR Part 135.1 and Section 3 Clause 24 CFR Part 135.38. Each proposal shall be accompanied by a cash deposit or a certified check drawn on some bank or trust company insured by the Federal Deposit Insurance Corporation, of an amount equal to not less than five percent (5%) of the proposal or in lieu thereof a bidder may offer a bid bond of five percent (5%) of the bid executed by a surety company licensed under the laws of North Carolina and per Section 9 of Form 5369 and individual sureties must be listed on US Treasury Circular Number 570 to execute the contract in accordance with the bid bond and per HUD-5369 Sections 9 and 10. Five Percent shall be based on the maximum bid price, ie: Base Bid plus Unit Prices plus Contingency Allowance plus All Add Alternates. Said deposit shall be retained by the Owner as liquidated damages in event of failure of the successful bidder to execute the contract within ten (10) days after the award or to give satisfactory surety as required by law. (Bid Bond not required if bid is less than $100,000.00.) Refer to provisions for Equal Employment Opportunity and payment of not less than the minimum salaries and wages indicated in the project manual must be paid on this project. A Performance Bond and a Payment Bond will be required for one hundred percent (100%) of the contract price. Performance and Payment Bond not required if Bid is less than $100,000.00. Payment will be made on the basis of ninety percent (90%) of monthly estimates and final payment made upon completion and acceptance of work. -At Project NC 70-2: Replace existing door slab and hardware at bedroom, walk-in closet and bathroom, unless otherwise noted. Replacement doors to be painted, solid core, wood doors with new hardware. Paint existing hollow metal door frames. - At Project NC 70-2: All other doors to remain; unless otherwise noted. -At Project NC 70-3: replace existing door slab and hardware at all locations shown on plans, unless otherwise noted. Replacement doors to be painted, solid core, wood doors with new hardware. Paint existing wood door frames and wood door casing. - Provide all other work as shown on plans, in the project manual and as required by building codes and the authority having jurisdiction. rovide all labor, materials and equipment required to execute the work as indicated for the miscellaneous interior and exterior improvements.

Details

Division 08 - Openings, Doors and Frames, Windows.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents