Reported | 11/15/2019 12:00 AM |
Project Title | Well 1A and Well 6 Treatment Project |
Physical Address | View project details and contacts |
City, State (County) | Niantic, CT 06357 (New London County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Pumps and Wells |
Contracting Method | Competitive Bids. |
Project Status | Bidding |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | DAS Prequalification Certificate Required The goals for this project are a minimum of 3.0 percent D/MBE participation and 5.0 percent D/WBE participation by certified DBEs Work consists of the installation of approximately 1,500 linear feet of a raw water transmission main to connect Well 1A with the Well 6 Water Treatment Plant (WTP), modifications to the WTP including installation of a fourth filter, rehabilitation of the existing three filters including installation of new GreensandPlus filter media, an addition to the WTP building and upgrades to the chemical feed systems, 2 new well pumps, building systems, and instrumentation and control system and the addition of 2 generators. Goals: Disadvantaged Business Enterprise (DBE) goals are applicable to the total dollars paid to the construction contract. The goals for this project are a minimum of 3.0 percent D/MBE participation and 5.0 percent D/WBE participation by certified DBEs. |
||||||||||||
Details |
|
||||||||||||
Bidder's List | View project details and contacts | ||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |