Similar Projects
Residence Inn By Marriott / Montgomery
New Construction, Infrastructure
Design
$3,000,000 CJ est. value
Montgomery, AL 36117

Micro-Milling, Resurfacing, Traffic Signals, and Traffic Stripe on Wares Ferry Road
Infrastructure
Bidding
$3,251,228 CJ est. value
Montgomery, AL 36117

Micro-Milling, Resurfacing, Traffic Signals, and Traffic Stripe on Wares Ferry Road
Infrastructure
Bidding
$3,251,228 CJ est. value
Montgomery, AL 36117

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Z2lb--Construction Management Services (322) Re-Asphalt Montgomery Regional Office
Term Contract
Post-Bid
Montgomery, AL 36109

2020 Water Main Replacement Project
Results
$1,317,872 est. value
Montgomery, AL

Crack Sealant, Asphalt
Infrastructure
Results
$43,200 est. value
Montgomery, AL

Pike Road Housing Development
New Construction, Infrastructure
Pending Verification
$400,000,000 CJ est. value
Pike Road, AL 36064

Pike Road Housing Development
New Construction, Infrastructure
Pending Verification
$400,000,000 CJ est. value
Pike Road, AL 36064

FMTC Running Track Lighting
Infrastructure
Bidding
$35,000 CJ est. value
Montgomery, AL 36104

RSA Annex Project Phase 1 Sitework
Infrastructure
Post-Bid
Montgomery, AL

Hope Hull AASF 1 Tarmac Repairs
Infrastructure
Results
$1,800,000 est. value
Hope Hull, AL 36043

Montgomery (JFHQ Compound) Various Site Repairs
Infrastructure
Bidding
$140,000 CJ est. value
Montgomery, AL 36109

Various County Road Resurface Project
Infrastructure
Post-Bid
Hope Hull, Montgomery, Ramer, AL 36124

2021 Boylston Water Main Replacement Project
Infrastructure
Results
Montgomery, AL

Last Updated 08/23/2022 07:02 AM
Project Title

Terminal Ramp Expansion and Fire Lane Construction At The Montgomery Regional Airport

Physical Address View project details and contacts
City, State (County) Montgomery, AL 36108   (Montgomery County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Runways/Taxiways, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

Plans and specifications are for viewing purposes only and in order to be considered an official bidder contractors must obtain plans and specifications from Goodwyn Mills & Cawood Inc. Please also fill out the order form if it is in the ITB and email that form to the GMC contact PLEASE NOTE: The estimated value listed for this project is for searchability purposes only and does not reflect the actual construction budget as determined by the owner. It should not be used for estimation purposes at this time. Major items of work include: Grading, Drainage, Base, Pavement, Concrete, Electrical, Fencing and related appurtenances. Each proposal must be accompanied by a bid guaranty in the amount of five (5) percent of the total amount of the bid, but not to exceed $50,000. The bid guaranty may be by certified check or bid bond made payable to the Montgomery Airport Authority. All Bidders bidding in amounts exceeding that established by the State Licensing Board for General Contractors must be licensed under the provisions of Title 34, Chapter 8, Code of Alabama, 1975, and must show evidence of license before bidding or bid will not be received or considered by the Engineer; the Bidder shall show such evidence by clearly displaying the license number on the outside of the envelope in which the Proposal is delivered. "A contractor must have a Heavy and Railroad major license or a Heavy and Railroad specialty license to bid as prime for this project." Bids may be held by the Montgomery Airport Authority for a period not to exceed ninety (90) days from the date of the bid opening for the purpose of evaluating bids prior to award of contract. Award of contract is subject to requirements in the contract documents including, but not limited to, the following Federal provisions: 1) Buy American Preference 2) Civil Rights Title VI Assurances 3) Equal Employment Opportunity 4) Davis Bacon 5) Debarment and Suspension 6) Disadvantaged Business Enterprise 7) Foreign Trade Restriction 8) Lobbying Federal Employees 9) Recovered Materials A Disadvantaged Business Enterprise (DBE) Goal of 10.64% has been established for this project. The Montgomery Airport Authority, in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78 Stat. 252, 42 U.S.C. 2000d to 2000d-4) and the Regulations, hereby notifies all bidders that it will affirmatively ensure that any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full and fair opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award. The Montgomery Airport Authority reserves the right to reject any and all bids and to waive any informality or irregularity in the bids received.

Details

Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Airfield Signaling and Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents