Similar Projects
Fort Sanders to Tyson Park Connection - City of Knoxville
Infrastructure, Alteration
Conception
$5,915,000 est. value
Knoxville, TN 37916

Carter-Lee Park - Town of Smyrna
Infrastructure
Conception
$600,000 CJ est. value
Smyrna, TN 37167

Bottled Blonde / Nashville
New Construction, Infrastructure - 25,000 SF
Design
$20,000,000 CJ est. value
Nashville, TN 37201

The resurfacing using high performance fog seal on S.R. 107
Infrastructure
Design
$496,550 CJ est. value
Del Rio, TN 37727

Directional Boring and Installation of Six Inch Water Supply Line at the Lincoln County Courthouse
Infrastructure
Bidding
$100,000 CJ est. value
Fayetteville, TN 37334

GRSM 149285 / 149368 Great Smoky Mountain National Park
New Construction, Infrastructure, Renovation - 6,875 SF
Bidding
$10,000,000 CJ est. value
Gatlinburg, TN 37738

Painting of Mast Arms
Infrastructure
Sub-Bidding
$70,000 CJ est. value
Collierville, TN 38017

Lawn Mowing, Weed Eating, Spraying, and Landscape Services for Buildings, Grounds, Substations, Pump Stations and Water Tank
Term Contract
Sub-Bidding
Newport, TN 37821

Joy Gleghorn Nature Preserve at Wells Hill Park Site Improvements
Post-Bid
Fayetteville, TN 37334

Northview Baseball and Softball Fields
New Construction
Post-Bid
TN

Gallatin Training Facility Mass Grading
Results
Gallatin, TN 37066

GRSM 158579/202623 - Look Rock Rehabilitation
Renovation
Results
$1,000,000 to $5,000,000 est. value
Maryville, TN

Bledsoe Fall Creek Falls Fiber Optic Expansion
Renovation
Construction
Pikeville, TN 37367

Legacy at Highland Estates
New Construction, Infrastructure
Pending Verification
$21,000,000 CJ est. value
Columbia, TN 38401

Riverview Square
New Construction, Infrastructure - 45,000 SF
Pending Verification
$50,000,000 CJ est. value
Clarksville, TN 37040

Last Updated 08/17/2022 12:35 PM
Project Title

Upgrade Wastewater Pumping Station North Fork Subdivision, 2022 Imminent Threat Grant

Physical Address View project details and contacts
City, State (County) Moscow, TN 38057   (Fayette County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $138,500 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The owner reserves the right to waive any informalities or to reject any or all bids. Each bidder must deposit with his bid, security in the amount, form and subject to the conditions provided in the Information for Bidders. Attention of bidders is particularly called to the requirements as to conditions of employment to be observed. No bidder may withdraw his bid within 60 days after the actual date of the opening thereof. The Information for Bidders, Form of Bid, Form of Contract, Plans, Specifications, and Forms of Bid Bond, Performance and Payment Bond, and other contract documents may be examined at the following City of Moscow, City Hall, 14075 Highway 57, Moscow, TN 38057 King Engineering Consultants, Inc., 3355 Poplar Avenue, Ste 200, Memphis, TN 38111.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents