Similar Projects
Emerging Environmental Requirements Acquisition (EERA)
Design
Less than $49,000,000 est. value

Emerging Environmental Requirements Acquisition (EERA)
Design
Less than $49,000,000 est. value

Great Lakes Group Optimized Environmental Remediation Contract
Post-Bid
Dayton, Wright Patterson Air Force Base, OH

Great Lakes Group Optimized Environmental Remediation Contract
Post-Bid
Dayton, Wright Patterson Air Force Base, OH

Rapid Response 6 Environmental Remediation Services
Results
Less than $80,000,000 est. value

Rapid Response 6 Environmental Remediation Services
Results
Less than $80,000,000 est. value

Seasonal Wetlands
Post-Bid
Crestline, OH 44827

Stream Restoration Plan
Results
Less than $499,000 est. value
Whitehall, OH 43213

Construction of the Oakwoods Nature Preserve Wetland Restoration Project
Post-Bid
Less than $1,017,600 est. value
Findlay, OH 45840

Windy Point Wetland Restoration and Creation Project
Results
Celina, OH 45822

City of Bellefontaine Blue Jacket Creek Enclosure Project
Post-Bid
Bellefontaine, OH

2019 Sunny Acres Floodplain Restoration and Wetland Creation
Results
$140,000 est. value
Hebron, OH 43205

Mentor Marsh Salt Remediation Design/Build
Post-Bid
$12,000,000 est. value
Mentor, OH 44060

Beaver Creek Restoration Design/Build
Results
Less than $838,340 est. value
Chardon, OH 44024

Penn 7 Emergent Coastal Floodplain Wetland Restoration Project
Results
Toledo, OH

Reported 03/02/2021 11:25 AM
Project Title

Chagrin River Access 2021

Physical Address View project details and contacts
City, State (County) Eastlake, OH 44095   (Lake County)
Category(s) Environmental
Sub-Category(s) Wetlands/Remediation
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Area of dredging is within the following limits: A.) Approximately 6600 lineal feet of the Chagrin River from the rivers mouth at Lake Erie to 1/4 mile past the Lakeshore Blvd Bridge. B.) Approximately 3100 lineal feet in the East Channel and C.) Approximately 3200 lineal feet in the West Channel. Also included is setting up to twenty buoys as furnished by the P.A.E.O.

Details

Division 02 - Existing Conditions, Environmental Assessment, Natural Environment Assessment, Water Remediation.
Division 32 - Exterior Improvements, Wetlands.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents