Similar Projects
RFP - Stream Restoration at Forty Acre Hp
Infrastructure
Conception
$250,000 CJ est. value
Columbia, SC 29201

Vector Control New Lab Facility - Richland County
New Construction, Infrastructure
Conception
$750,000 CJ est. value
Columbia, SC 29201

Shady Lane Force Main Replacement (SS7548) CDBE - Part 1
Infrastructure
Design
$661,770 CJ est. value
Columbia, SC 29206

Patterson Road Sidewalk
Infrastructure
Design
$250,000 CJ est. value
Columbia, SC 29209

Crane Creek 02 & 04 SSES Rehabilitation Project
Infrastructure
Bidding
$700,000 CJ est. value
Columbia, SC 29201

Design-Build - SCDNR Richland - Regional Skeet/Trap Event Range - Pavilion Rebid
New Construction, Infrastructure - 9,934 SF
Bidding
$2,000,000 CJ est. value
Eastover, SC 29044

Richland School District 2 Spring Valley H.S. Renovation
Addition, New Construction, Renovation, Infrastructure - 20,000 SF
Sub-Bidding
$30,000,000 CJ est. value
Columbia, SC 29229

Jackson Creek Site Restoration Project
Infrastructure
Post-Bid
Columbia, SC 29206

City of Columbia Olympia Fire Station Replacement
Demolition, New Construction, Infrastructure
Post-Bid
$7,000,000 CJ est. value
Columbia, SC 29201

Bitternut Pump Station Improvements (WM4574) CDBE - Phase II
Renovation, Infrastructure
Results
$833,948 CJ est. value
Columbia, SC 29209

Navy Base Intermodal Facility Advanced Work Package project
Demolition, Infrastructure
Results

Clutch Coffee / Columbia
New Construction, Infrastructure - 798 SF
Construction
$250,000 CJ est. value
Columbia, SC 29209

Aldi #144 / Irmo
New Construction, Infrastructure - 21,831 SF
Construction
$5,500,000 CJ est. value
Irmo, SC 29063

University of South Carolina Health Sciences Campus
New Construction, Infrastructure - 292,000 SF
Pending Verification
$300,000,000 CJ est. value
Columbia, SC 29209

Colony Northpointe Recreation Project (Design Engineering for Bridge)
New Construction, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Columbia, SC 29201

Last Updated 05/30/2023 05:10 PM
Project Title

New Saluda Elementary School - Phase 1 Prep & Demo

Physical Address View project details and contacts
City, State (County) Columbia, SC 29205   (Richland County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Elementary School, Site Development
Contracting Method Competitive Bids
Project Status All Sub-Bids Received, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $37,000,000 [brand] Estimate
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

M. B. Kahn Construction Co., Inc., the Construction Manager at Risk, interested contractors and vendors to provide pricing and cost proposals for the Phase 1 Early Prep Package for the New Saluda Elementary School for the Saluda County School District. Proposers are not to contact the Owner or Architect directly. All inquiries are to be made to David Knight at (803)-227-1243 or via email: dknight@mbkahn.com. Questions or clarifications need to be submitted in writing to the MBK no later than close of business on Tuesday, May 23, 2023 for them to be responded to by addenda. The general scope of work is labeled as Phase 1- Demolition on the drawings and includes, but is not limited to, the following: - Demolition and abatement of one classroom wing (Approx. 9,700 sf) and associated sidewalks and walkway covers. The storefront windows and classroom LED lights are to be removed and turned over to the Owner. - Provide temporary walkway as indicated on drawing - Removal of existing ETV tower - Infill two wall areas as shown - Removal of existing transformer and temporary feed to existing building - Temporary relocation of an existing HVAC unit serving the existing building - Installation of underground telecom raceways for the relocation of the existing fiber optic cables, indicated on the drawings as Phase 1 - The Owner has performed or will have performed the following items: --- Removal of the keyed core door locks --- Removal of the wall-hung HVAC units --- Removal of the LED light fixtures in the corridor --- Relocation of the two play structures indicated --- Furnishing and installing the new classroom interior wood door and hardware indicated NOTE: All work marked Phase 2 will be bid at a later date. Proposals exceeding $100,000 may be required to provide a 100% Performance and Payment Bond. The cost of the Performance and Payment Bond should NOT be included in the proposal, but rather shown as a separate item (including the surety provider). Along with pricing, please include any assumptions and clarifications you may have made (i.e. quantities, components, etc.). Any information provided about the sequencing and total duration of your work will be beneficial. Minority businesses are encouraged to submit proposals for this construction project. M.B. Kahn and the Owner shall award contracts to businesses who hire without regard to race, religion, color, creed, national origin, sex, age or handicapping condition.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents