Similar Projects
Cooledge Road Sidewalk Project
Infrastructure
Bidding
Tucker, GA 30084

Hugh Howell Road (SR 236) Multi-Use Trail Project
Infrastructure
Bidding
Tucker, GA 30084

I-285 WB Ashford Dunwoody Road Ramp Extension
Post-Bid
GA

Dunwoody Parking Lot Repairs
Post-Bid
$380,000 est. value
Dunwoody, GA 30338

East Mountain Street Sidewalk
Results
Stone Mountain, GA 30086

Pedestrian Enhancements - Trailhead and Rowland Street
Results
Clarkston, GA

Dalrymple Road Sidewalk TS168
Infrastructure
Bidding
Sandy Springs, GA

Public Work Services
Post-Bid
Brookhaven, GA

Elmdale Drive Sidewalk Project
Results
Tucker, GA 30084

Roadway, Sidewalk, Right of Way Maintenance and Repair Services
Infrastructure
Post-Bid
Sandy Springs, GA

0.180 Mile of Widening and Reconstruction for Ramp Improvements on US 78/SR 10 at SR 236
Results
GA

Murphey Candler Park - Horseshoe
Infrastructure
Post-Bid
Atlanta, GA 30319

Ashford Dunwoody Road Multiuse Path
New Construction
Results
Brookhaven, GA

Pedestrian Safety And Bicycle Trail Improvements
Results
Decatur, GA

Concrete Pads for Marta Shelters
Results
Stonecrest, GA

Last Updated 03/25/2022 08:14 AM
Project Title

Parking Lot Repair/Resurface/Sealcoat

Physical Address View project details and contacts
City, State (County) Chamblee, GA 30341   (DeKalb County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $27,125
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Scope: The contractor will saw cut the sensor loops near the gate 1 inch down into the concrete curb. The contractor will excavate existing damaged/unsuitable material and provide a uniform and seamless integration into existing asphalt. The contractor will install GAB and asphalt at the gate from curb to curb from orange marking to orange marking (exact dimensions and thickness of asphalt TBD). The contractor will repair cracks with hot crack sealant at the designated area within the fence. The contractor will sealcoat the entire area inside the fence for a uniform appearance. The contractor will re-paint all parking lines inside the fence. The contractor will remove the concrete island ensuring to saw cut the raw edge toward the fence. The contractor will install 2” of GAB and 4” of asphalt and integrate uniformly into existing asphalt. The contractor will clean up all debris and unused material and remove both from the worksite prior to receiving the final contract payment.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents