Similar Projects
Fort Sanders to Tyson Park Connection - City of Knoxville
Infrastructure, Alteration
Conception
$5,915,000 est. value
Knoxville, TN 37916

Indefinite Delivery/Indefinite Quantity Electronic Security Systems (ESS) 7th Generation
Term Contract
Design
Less than $675,000,000 est. value

ADA Compliance UTK and UTIA (UTIA Lewisburg)
Infrastructure
Design
$719,000 CJ est. value
Knoxville, TN 37996

Traffic Signal System
Infrastructure
Bidding
$594,000 CJ est. value
Farragut, TN 37934

The Grading, Drainage, Retaining Walls and Paving on U.S. 441 (S.R. 71)
Infrastructure
Bidding
$12,012,888 CJ est. value
Knoxville, TN 37920

SWC 436 Lamps, Batteries and Scrap Metal Recycling
Term Contract
Post-Bid

Hanger Fans
Term Contract
Post-Bid

Demolition of Aircraft Hangar
Demolition
Results
Knoxville, TN 37920

HOC Northwest Building
Renovation
Results
Knoxville, TN

Smokies New Knoxville Baseball Stadium
New Construction, Infrastructure
Design
$80,100,000 CJ est. value
Knoxville, TN 37915

Single Phase Pad Mounted Transformers
Alteration
Bidding
Knoxville, TN

Construction of 500 KV and 230 KV Substations and Transmission Lines
New Construction, Alteration
Post-Bid

UPS Replacement
Alteration
Results
Knoxville, TN 37918

The Rowan Apartments
New Construction, Infrastructure
Design
$64,000,000 CJ est. value
Knoxville, TN 37923

Galvanized Waterlines Replacement - FY 2023 Phase 1
Infrastructure
Bidding
$200,000 CJ est. value
Knoxville, TN 37902

Last Updated 08/05/2022 05:32 AM
Project Title

FY23 FC Fiber Optic Cable Installation

Physical Address View project details and contacts
City, State (County) Knoxville, TN 37902   (Knox County)
Category(s) Heavy and Highway, Industrial/Manufacturing, Single Trades
Sub-Category(s) Electric, Power Plant, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

We are in year 2 (Fiscal Year 2023) out of an expected 7-year broadband network build-out. The scope of work consists of construction services to install new fiber optic cable. Most of this new cable will be installed aerially but will also support underground installations. Installation will be approximately 580,800 linear feet of which 80% is aerial and 20% underground. The work shall be completed in strict accordance with the Contract Documents. CONTRACTOR will provide all labor, equipment, and incidentals, etc. as required to complete the work. Q & A deadline: Aug 12, 2022 4:00:00 PM EDT This work is to be bid only by KUB pre-qualified contractors in the following areas: 8.1 Fiber Optic System Outside Plant Construction, Unlimited. Bids will not be accepted from contractors who are not pre-qualified in the referenced categories prior to the bid opening.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete, High-Performance Structural Concrete, Concrete Finishing, Specialty Placed Concrete, Precast Structural Concrete, Precast Concrete Specialties.
Division 04 - Masonry, Unit Masonry, Concrete Form Masonry Units.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Access Doors and Panels, Coiling Doors and Grilles, Windows, Hardware, Glazing.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 10 - Specialties, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Safety Specialties, Emergency Aid Specialties, Fire Protection Specialties, Exterior Specialties, Security Mirrors and Domes.
Division 11 - Equipment, Parking Control Equipment, Loading Dock Equipment, Security Equipment.
Division 13 - Special Construction, Radiation Protection, Special Instrumentation, Seismic Instrumentation.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Surveillance, Video Surveillance, Electronic Personal Protection Systems, Electronic Detection and Alarm, Fire Detection and Alarm, Radiation Detection and Alarm, Fuel-Oil Detection and Alarm.
Division 31 - Earthwork, Grading, Earthwork Methods, Soil Treatment, Soil Stabilization.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Fuel Distribution Utilities, Electrical Utilities, Electrical Utility Transmission and Distribution, Utility Substations, Utility Transformers, High-Voltage Switchgear and Protection Devices, Medium-Voltage Utility Switchgear and Protection Devices, Communications Utilities.
Division 41 - Material Processing and Handling Equipment, Conveyors, Cranes and Hoists.
Division 46 - Water and Wastewater Equipment.
Division 48 - Electrical Power Generation, Common Work Results for Electrical Power Generation, Instrumentation and Control for Electrical Power Generation, Electrical Power Generation Equipment, Electrical Power Generation Testing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents