Similar Projects
Mill, AC Resurfacing, Full Depth Reclamation, Pipe Work
Infrastructure
Conception
$10,947,000 CJ est. value
Fort Pierre, SD 57532

Mill, AC Resurfacing, Full Depth Reclamation, Pipe Work
Infrastructure
Conception
$10,947,000 CJ est. value
Fort Pierre, SD 57532

AC Surfacing of Shoulders
Infrastructure
Design
$2,877,000 CJ est. value
Fort Pierre, SD 57532

AC Surfacing of Shoulders
Infrastructure
Design
$2,877,000 CJ est. value
Fort Pierre, SD 57532

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Asphalt Surface Treatment
Infrastructure
Results

Water Storage Tank - City of Fort Pierre
New Construction, Infrastructure
Conception
$1,760,000 CJ est. value
Fort Pierre, SD 57532

Underground Infrastructure Inspection
Infrastructure
Post-Bid

OSRWSS South Coreline Reservoir and Pump Station No. 1 Upgrades
Renovation, Infrastructure
Results
$5,470,000 CJ est. value
Fort Pierre, SD 57532

Airport Pavement Maintenance Project
Infrastructure
Post-Bid

2022 Fort Pierre Asphalt Surface Treatment
Infrastructure
Post-Bid
$2,000,000 CJ est. value
Fort Pierre, SD 57532

2022 Fort Pierre Mill & Overlay
Infrastructure
Post-Bid
Fort Pierre, SD

RFP Construction Manager at Risk - Stanley County School District Multi-Purpose Building Project
New Construction, Infrastructure
Post-Bid
$350,000 CJ est. value
Fort Pierre, SD 57532

Last Updated 04/11/2023 01:34 AM
Project Title

Slide Repair, Erosion Control, Pipe Work

Physical Address View project details and contacts
City, State (County) Fort Pierre, SD 57532   (Stanley County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected June 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $1,061,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

US14 - Fm 8 E to 11 E of Hayes As of April 11, 2023, the project is in Final Planning status. Anticipated Construction year is 2023. SDDOT - Slide Repair, Erosion Control, Pipe Work *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents