Similar Projects
PQ List for HVAC Rehabilitation, Repairs and Renovation Services (CD)
Term Contract
Bidding
Pittsburgh, PA 15219

Herron Hill Reservoir Improvements: Sodium Hypochlorite Building - HVAC Construction
Alteration
Bidding
$31,193 est. value
Pittsburgh, PA

Cathedral of Learning Ground Floor Renovation - HVAC Construction
Post-Bid
$875,000 to $950,000 est. value
Pittsburgh, PA 15260

Drying Units
Post-Bid
Pittsburgh, PA 15201

West Allegheny High School Science Rooms Renovations - HVAC Construction
Results
Imperial, PA 15126

Mt. Lebanon Public Library 2020 HVAC Upgrades
Results
Pittsburgh, PA 15228

On-Call HVAC Services
Alteration
Bidding
Pittsburgh, PA

HVAC Rooftop Replacement - Community & Recreation Center
Post-Bid
Upper Sainte Clair, PA 15241

Roof and Make-up Air Unit Replacement at Jefferson Manor and Blawnox Apartments
Results
Penn Hills, PA 15235

Allegheny County Jail Kitchen Vent Repair
Term Contract, Alteration
Bidding
Pittsburgh, PA 15219

Frigidaire Window Air Conditioners
Post-Bid
Less than $30,000 est. value
Pittsburgh, PA 15219

Carmalt Pre-K-8 Humidity Control and Ventilation General, Mechanical And Electrical Primes
Results
Pittsburgh, PA 15234

HVAC Contract at Independence Middle School
Alteration
Bidding
Bethel Park, PA 15102

Temporary Classroom Alterations for J.E. Harrison Middle School - Mechanical Construction
Post-Bid
Pittsburgh, PA 15236

Moon Park Maintenance Building - HVAC Construction
Results
Moon, PA 15108

Last Updated 06/18/2021 10:31 AM
Project Title

East Headworks - Heating Ventilating and Air Conditioning HVAC

Physical Address View project details and contacts
City, State (County) Pittsburgh, PA   (Allegheny County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,985,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The East Headworks will provide preliminary treatment for a peak flow of 360 MGD. This contract is part of the overall wet weather plant expansion and will generally include the following: Modification of the Main Pumping Station to direct flows to the East and West Headworks facilities. 120-inch diameter conduit between the Main Pumping Station and the East Headworks. Six (6) mechanically cleaned bar racks and screenings conveying. Six (6) aerated grit tanks, grit pumping, concentrating and classifying equipment. Operations area that includes a control room, locker room, and break area. Removal of the West Headworks venturi flow meter. Replacement of the 120-inch diameter primary influent conduit. East, West and Center Primary Influent Conduits. Upgrade of the Headworks Odor Control System Modification of existing below grade pipe galleries. Various modifications to the existing West Headworks.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents