Similar Projects
City Park Fencing
Alteration
Bidding
$19,000 est. value
Woodsfield, OH

Fencing Products and Related Items and Services
Post-Bid
Dayton, OH

Emerald Alliance XI - Fencing and Gates
Post-Bid
$70,000 est. value
Cleveland, OH

Greenup Hydroelectric Project New Draft Tube Gate
Results
Hamilton, OH 45011

Fencing Construction
Results
North College Hill, OH 45231

Fence Repair Services
Post-Bid
Dayton, OH

2020 Guardrail and Fence Repair Program
Results
Delaware, OH

Fence Removal Bid
Post-Bid
Hillsboro, OH

CMHA Headquarters Gate Replacement
Results
Columbus, OH

Wright-Patterson AFB Swinging Gate Maintenance
Post-Bid
Wright Patterson Air Force Base, OH

Wildlife Fencing Installation - Phase 3
Results
$237,029 est. value
New Lexington, OH 43764

Cemetery Fences
Post-Bid
Clarington, OH

Fence Repair - FCI Elkton
Results
Lisbon, OH 44432

Temporary Fencing
Term Contract
Post-Bid
Dayton, OH

Jim Nichols Tennis Court Fence Restoration
Results
Less than $80,000 est. value
Dayton, OH

Reported 06/17/2021 12:00 AM
Project Title

Swinging Gate Maintenance WPAFB

Physical Address View project details and contacts
City, State (County) Wright Patterson Air Force Base, OH   (Greene County)
Category(s) Single Trades
Sub-Category(s) Fencing
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The contractor shall provide all personnel, tools, supplies, and equipment, materials, repair and replacement parts, transportation and communication necessary to inspect, maintain and repair Mechanized Swing and Sliding Gate systems located within the perimeter of Wright Patterson AFB OH (See Appendix B). The contractor shall provide on-site semi-annual inspection/preventive maintenance and authorized emergency and routine repair service. All maintenance and repair work performed under this Performance-based Work Statement (PWS) shall be in accordance with industry/commercial practices as well as all local, state, and federal regulations. Ensure areas are clean, orderly and free of debris upon completion of each service. If manufacturers’ recommended parts are not available, replacement parts shall be equal to or better than the manufacturer’s recommended part. Technicians performing work under this PWS shall be trained and have a minimum of 2 years certifiable experience inspecting, testing and maintaining mechanized Swing and Sliding Gate systems.

Details

Division 11 - Equipment, Parking Control Equipment, Parking Gates, Swinging Parking Gates.
Division 32 - Exterior Improvements, Fences and Gates.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents