Similar Projects
2023 Public Works Trench Drain Repairs and Wash Bay Improvements
Renovation, Infrastructure
Bidding
$700,000 CJ est. value
Minneapolis, MN 55439

Plumbing and Water Service Materials
Term Contract
Sub-Bidding
Saint Paul, MN 55102

Brooklyn Park Water Treatment Plant Check Valve Replacement
Renovation
Sub-Bidding
$200,000 CJ est. value
Brooklyn Park, MN 55443

Water Softener Installation
Post-Bid
Faribault, MN

2022 Seasonal Work and Materials
Term Contract
Post-Bid
Faribault, MN

Plumbing Service
Term Contract
Results
$250,000 est. value
Moorhead, MN

General Contractor for 1314 North 44th Avenue Piping
Alteration
Results
Minneapolis, MN 55412

Pipe Insulation
Term Contract
Post-Bid
MN

Century High School - Pool Addition - Bid Package 02
Alteration
Results
Rochester, MN 55906

Plumbing Services at all MCES Locations
Alteration
Post-Bid
Minneapolis, MN

Curling Facility Refrigeration System Replacement
Renovation, Alteration
Results
Duluth, MN 55802

Twin Cities Habitat for Humanity Plumbing
Alteration
Post-Bid
Saint Paul, MN 55106

2021 Plumbing Infrastructure Upgrade Program
Alteration
Results
Minneapolis, MN

Birch Lake ES Domestic Piping Replacement
Alteration
Post-Bid
White Bear Lake, MN 55110

Mechanical Pipefitting Services for all MCES Facilities
Alteration
Results
MN

Last Updated 01/19/2023 04:38 AM
Project Title

St. Cloud Technical High School Phase 2 Selective Demolition and Abatement Project

Physical Address View project details and contacts
City, State (County) Saint Augusta, MN 56301   (Stearns County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $2,888,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

The estimated construction cost for this Project is: $2,888,000.00. Pace Project No.: 10602171 o Selective demolition of the 1955 and 1975 Building Additions. o Disconnection and removal of the existing mechanical plumbing, and fire protection piping, insulation, and associated appurtenances serving the 1955 and 1975 Building Additions. Demolition back to the 1975 Building Boiler Room includes steam, steam condensate, domestic hot water, domestic hot water circulation, fire protection sprinkler, and gas. Demolition back to the public utilities includes domestic water, sanitary sewer, and storm sewer. o Disconnection and removal of the existing electrical system serving the 1955 and 1975 Building Additions. o Site restoration at these demolition locations consisting of backfilling, compaction, and site grading, site improvements, and hydroseeding. o Abatement of hazardous materials in the 1955 and 1975 Building Additions as defined in the project manual.

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents