Similar Projects
Cottonwood Drive/Lanceleaf Street Traffic Signal - Town of Parker
Infrastructure
Conception
$600,000 CJ est. value
Parker, CO 80134

Cottonwood Drive/Lanceleaf Street Traffic Signal - Town of Parker
Infrastructure
Conception
$600,000 CJ est. value
Parker, CO 80134

Life Time Athletic Resort / Castle Pines
New Construction, Infrastructure - 115,000 SF
Design
$30,000,000 CJ est. value
Castle Pines, CO 80108

Life Time Athletic Resort / Castle Pines
New Construction, Infrastructure - 115,000 SF
Design
$30,000,000 CJ est. value
Castle Pines, CO 80108

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Ridge Road Widening
Infrastructure
Results
Castle Rock, CO

Castle Pines Parkway Reconstruction - Monarch Boulevard to Yorkshire Drive and Lagae Road Intersection Widening
Infrastructure
Results
Castle Pines, CO

Castle Pines Village Infrastructure
Infrastructure
Pending Verification
$4,000,000 CJ est. value
Castle Rock, CO 80108

Tall Tales Ranch / Lone Tree
New Construction, Infrastructure
Pending Verification
$5,400,000 CJ est. value
Parker, CO 80134

Lincoln Avenue Widening - Keystone to Parker Road - Town of Parker
Infrastructure
Conception
$21,000,000 CJ est. value
Parker, CO 80134

Millers Landing Hotel
New Construction, Infrastructure
Design
$89,500,000 CJ est. value
Castle Rock, CO 80104

Pump and Motor Installation for Wells LDA-8, LDA-14, and DE-14
Infrastructure
Post-Bid
$500,000 CJ est. value
Perry Park, CO 80118

2022 Replacement Well A-1R project
Demolition, New Construction, Infrastructure
Results
$1,047,775 CJ est. value
Highlands Ranch, CO 80126

Ridgegate Southwest Village
New Construction, Infrastructure
Pending Verification
$440,000,000 CJ est. value
Lone Tree, CO 80134

Last Updated 10/16/2023 02:03 PM
Project Title

Parker Road (North) Operational Improvements

Physical Address View project details and contacts
City, State (County) Parker, CO 80138   (Douglas County)
Category(s) Heavy and Highway, Outdoor Lighting, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Roadway Lighting, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $6,132,933 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Reference Number 0000326251 Question Acceptance Deadline 08/16/2023 at 12:00 PM MT Questions are submitted online No Construction of intersection improvements, roadway widening, new multi-use trail, and relocation and replacement of traffic signal infrastructure on Parker Road (State Highway 83) between E-470 and Parkglenn Way. Work includes, but is not limited to, approximately 1,020 SY of concrete pavement, 1,800 Tons of asphalt pavement, 3,200 SY of concrete sidewalk, 3,100 SF of precast retaining walls, various traffic signal improvements at 8 poles locations, and associated stormwater improvements, earthwork, erosion control, signage and striping, and traffic control. Contract shall be completed on or before November 1, 2024 for this project. Liquidated damages will be charged in accordance with Trade Contractors Agreement, Article 4. Buyer Preferences, Guidelines & Requirements General Requirements - Bid Deposit Required - Insurance Required Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Maintenance Bond 100 % - Payment Bond 100 %

Details

Division 26 - Electrical, Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents