Similar Projects
Memphis Riverfront Tom Lee Park
New Construction, Renovation
Design
Memphis, TN 38103

Playground Equipment and Safety Surfacing
Bidding
Memphis, TN 38106

Tennis Courts 2021 Rehabilitation
Bidding
Columbia, TN 38401

Concrete Multi-Modal Path
Post-Bid
Chattanooga, TN 37402

Montague Park Development
Post-Bid
Chattanooga, TN

Driver and Marion Fields LPRF Grant Renovation Project
Results
Signal Mountain, TN 37377

Camp Jordan Soccer Expansion
Results
East Ridge, TN 37412

Dobyns-Bennett High School Tennis Court Improvements
Bidding
Kingsport, TN 37664

Children's Memory Garden
Post-Bid
Nashville, TN 37203

Summit Softball Complex Improvements Replace Foul Poles
Results
Less than $54,400 est. value
Ooltewah, TN 37363

Big Creek Park - Phase 3
Renovation
Bidding
Memphis, TN

Southwind High School Track Replacement
Post-Bid
Memphis, TN 38125

Summit Softball Complex Improvements Replace Shade Structure
Results
Less than $48,887 est. value
Chattanooga, TN 37402

Tennis Court Resurfacing, Color Coating and Crack Repair
Renovation
Bidding
Franklin, Spring Hill, TN 37174

Elmington Park Tennis Court
Post-Bid
Nashville, TN 37205

Reported 04/10/2021 12:00 AM
Project Title

Waynesboro City Park Pavilion

Physical Address View project details and contacts
City, State (County) Waynesboro, TN 38485   (Wayne County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Demolition: Existing concrete slab, bricks, blocks, etc. must be removed from premises with area being prepped afterward using #57 gravel. Slab: Construct 30x60 monolithic concrete slab, min of 5 inches in depth, using 3500 PSI w/ fiber, 2 strands inch rebar on perimeter, 6 mil plastic and rewire throughout. Must be light broom finished and sealed. Framing: 10- 8x8 post, 30-foot trusses set w/ 4/12 pitch on 2-foot centers w/ 16-inch overlay typical. Double 2x12 beams at 8-foot AFF. 2x4 lathe on 2-foot centers. #1 brown galvalume metal roofing and gable ends that match existing bathrooms. Finish: Both 30-foot ends enclosed w/ 2x4 walls and 7-inch hardy board lap siding on exterior and interior. Caulked and painted with color TBD. Electrical: Pull Conduit from existing bathroom breaker box mounting 8 GFI plugs on post and end walls. Wire and mount 8 LED fixtures on trusses being operated on one switch. Must be wired to code and inspected.

Details

Park/Playground, New Construction.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents