Similar Projects
Ongoing and As-Needed Fabric-Formed Concrete Revetment Mats
Term Contract, Infrastructure
Results
New Port Richey, FL

As Needed Class III Reinforced Concrete Pipe and Gaskets for Pipe Joints
Infrastructure
Results
New Port Richey, FL

SNL Infrastructure Construction and Maintenance
Infrastructure
Post-Bid

Howard Avenue Drainage Improvements - Phase II
Results
Less than $138,171 est. value
Dade City, FL 33525

Storm Water Pipe Repair - Storm Water Pipe Rehabilitation and Inspection
Infrastructure
Results
$325,000 est. value

Supply Riprap Erosion Control and Sidewalk Repair
Infrastructure
Results
Holiday, FL 34691

As Needed Corrugated Polypropylene High Performance Storm Pipe – Multi-Year
Infrastructure
Results
New Port Richey, FL

Pompanic Street Paving and Draining Construction/Repair
Infrastructure
Results
San Antonio, FL 33576

Main Avenue and 15th Street Intersection Drainage Improvements Project
Results
$89,120 est. value
Dade City, FL 33523

Dade Oaks Flood Detention Facility Project
Infrastructure
Results
Dade City, FL 33523

Stormwater Culvert Replacement Contract - Multi Year
Term Contract, Infrastructure
Results
FL

2020 Seawall Repair - Jasminpark
Post-Bid
$360,000 est. value
New Port Richey, FL 34652

KCS NASA Causeway Shoreline Repairs
Term Contract
Post-Bid
$1,000,000 to $5,000,000 est. value

Seven Springs Wastewater Treatment Facility Reject Pond Improvements
Infrastructure
Results
$1,000,000 est. value
FL

Colonial Manor Drainage Improvement Project
Infrastructure
Bidding
Elfers, FL 34680

Last Updated 02/23/2022 01:54 AM
Project Title

As-Needed Pond Liner Replacement and Repairs

Physical Address View project details and contacts
City, State (County) Land O' Lakes, Spring Hill, Wesley Chapel, Zephyrhills, FL 34610   (Pasco County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Contractor for the removing and replacing of designated pond liners. Patchwork and replacement of the liner will be on an as-needed basis. The scope of work will include, but not limited to, cutting then removing existing liner and replacing with new High-Density Polyethylene (HDPE) liner material as well as building berms and manipulating soil cover.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Ponds and Reservoirs, Pond and Reservoir Liners, Pond Liners.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents