Similar Projects
Emerson Hills Apartments
New Construction
Conception
Kannapolis, NC 28083

450 Polo Road
New Construction
Conception
Winston-Salem, NC 27105

The Woodlands At Echo Farms Tract 3C
New Construction - 113,007 SF
Design
$10,000,000 CJ est. value
Wilmington, NC 28412

Farrington Trace
New Construction - 102,718 SF
Design
Greenville, NC

Liv Cary Apartments
New Construction - 418,962 SF
Bidding
$62,000,000 est. value
Cary, NC 27518

Senior Services of Winston Salem Intergenerational Facility
New Construction - 62,585 SF
Sub-Bidding
$5,000,000 to $10,000,000 CJ est. value
Winston-Salem, NC 27105

Kingsley Park
New Construction
Post-Bid
Fayetteville, NC

Parkwood West
New Construction
Post-Bid
Fayetteville, NC

Senior Center Phase II
Results
Greenville, NC 27858

Tyrrell County Rest Area and Visitor Center Renovations
Renovation
Results
NC

Stockton Pointe
New Construction
Construction
$4,789,135 est. value
Kinston, NC

Davis Drive Apartments
New Construction - 107,950 SF
Construction
$15,000,000 est. value
Morrisville, NC

Crescent Hill Apartments
New Construction
Pending Verification
Arden, NC 28704

Audubon Place - Phase III
New Construction - 28,000 SF
Pending Verification
Arden, NC 28704

Stanley White Recreation Center
New Construction
Conception
$8,000,000 est. value
New Bern, NC 28560

Reported 04/28/2022 04:23 PM
Project Title

Battleboro Community Center

Physical Address View project details and contacts
City, State (County) Rocky Mount, NC 27809 (Edgecombe, Nash Counties)
Category(s) Entertainment/Recreation
Sub-Category(s) Clubhouse/Social Club
Contracting Method Competitive Bids.
Project Status Bidding on Hold
Bids Due View project details and contacts
Estimated Value Less than $500,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Battleboro Community Center project consists of a new 1,252 square foot community building. Construction includes but is not limited to wood framed structure, wood trusses, exterior siding, Asphalt shingles, casework, painting, flooring, and ceilings. Associated plumbing, mechanical, and electrical work is included.

Details

Clubhouse/Social Club, 1,252 SF New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents