Similar Projects
Pavement Resurfacing Including Sidewalk Ramps
Infrastructure
Bidding
NY

Highway
Infrastructure
Bidding

Milling Services at Hudson Valley Transportation Management Center
Post-Bid
$50,000 to $500,000 est. value
Hawthorne, NY 10532

Providing Hot Mix Asphalt
Post-Bid
Goshen, NY 10924

Design Build Services for I 390/I 490/31 (Lyell Ave) Interchange Improvements Phases 3 and 4
Term Contract
Results
Less than $85,000,000 est. value
NY

Phase 2 Leland Street Area Pavement Restoration
Results
Elmira, NY 14904

Repair Potholes
Infrastructure
Bidding
Staten Island, NY 10314

Citywide Pavement Resurfacing 2020
Post-Bid
New Rochelle, NY 10801

Cold Milling and Crushing/Screening of Asphalt Pavement
Results
NY

Design for Driveway Renovation at Pierce IRA
Infrastructure
Bidding
Less than $50,000 est. value
Webster, NY 14580

Wallkill Valley Rail Trail Improvements
Post-Bid
Rosendale, Ulster, NY

Installation/Service and Repair of Asphalt, Concrete, Drainage, Sewer, Curbing, Steps and Walls
Results
Pelham, NY 10803

Design for Driveway Renovation at Brooklawn IRA
Infrastructure
Bidding
Less than $50,000 est. value
Rochester, NY 14618

Street Repair and Re-Paving Services
Post-Bid
Spencer, NY 14883

Milling and Asphalt Paving
Term Contract
Results
Clifton Park, NY 12065

Last Updated 10/22/2021 05:12 AM
Project Title

Carman Road Safety Enhancements, Major Intersection Reconstruction

Physical Address View project details and contacts
City, State (County) Schenectady, NY 12303   (Schenectady County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $3,250,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Enhance safety for motorists and pedestrians, while also reducing traffic delays and improving traffic flow through this intersection. The project plans call for installing a new sidewalk along eastbound Route 146 between Coons Road and the existing sidewalk north of Jessamine Lane. Route 146 would be resurfaced between Coons Road and the New York State Thruway Bridge. Project construction is scheduled to begin Spring 2021

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents