Similar Projects
Fernwood Elementary school - Generator Repair and Parts Replacement
Renovation
Sub-Bidding
$120,000 CJ est. value
Chicago, IL 60628

Solid State Modulator
Term Contract
Sub-Bidding
Lemont, IL 60439

CPS Goes Solar
Infrastructure
Post-Bid
$8,000,000 est. value
Chicago, IL 60659

Furnish and Deliver Electric Motors, Pumps, Drives, Breakers and Transformers at Various Locations (Re-bid)
Term Contract
Post-Bid
$227,500 CJ est. value
Chicago, IL 60604

Seminole Lane Street Lighting
Alteration
Results
Mount Prospect, IL

Bremen High School Lighting Replacement
Alteration
Results
Midlothian, IL 60445

Upgrade Parking Lots, Drainage, Lighting, and Landscaping South Suburban College - Illinois Capital Development Board
Infrastructure
Pending Verification
$231,245 CJ est. value
South Holland, IL 60473

Installation of New Fiber Optic Cable, Conduit, PTZ Cameras, Network Switches Along Four Different Corridors
Infrastructure
Sub-Bidding
$4,000,000 CJ est. value
Chicago, IL 60652

Digital Displays
Term Contract
Post-Bid
Glenview, IL 60026

Village Hall Generator Improvements
Alteration
Results
$200,000 est. value
Flossmoor, IL 60422

Construction of DPPS Emergency Generation System Modifications
Alteration
Post-Bid
$360,000 est. value
Elmhurst, IL 60126

Public Works Service Center Generator
Alteration
Results
$155,000 est. value
Flossmoor, IL 60422

Performance Contracted Energy Project
Alteration
Post-Bid
Arlington Heights, IL

Fire Station Generator Replacement
Alteration
Results
$300,000 est. value
Morton Grove, IL

Guaranteed Energy Savings Contract
Alteration
Post-Bid
Country Club Hills, IL

Last Updated 10/16/2023 03:09 PM
Project Title

Installation of 200A Panel at Volta Elementary School

Physical Address View project details and contacts
City, State (County) Chicago, IL 60625   (Cook County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids
Project Status Results, Construction start expected November 2023
Bids Due View project details and contacts
Estimated Value $21,780 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Provide Labor and Materials: Install new 200A panel with new feed from switchgear in basement. Disconnect 100A feed from 2nd floor panel to 3rd floor panel. Furnish and install (1) 200A 3 phase, 4 wire 42 circuit panel fed from 200A fused switch in basement switchgear and all associated conduit, cable fittings, floor cores, boxes etc. Contractor/ Vendor is to secure all necessary permits. Contractor/Vendor is to provide any mechanical tools/equipment necessary for project completion. Not responsible for contractor/vendor errors as a result of non-field verification. Material and installation must comply in accordance with CPS Specifications. Invitation to Bid If CPS properties are damaged during installation, contractor/vendor is to replace and or repair as necessary. Clean surrounding area and all debris is swept and disposed of daily. Test and verify operation.

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents