Similar Projects
T. Rockland, CTH JJ, Manitowoc River Bridge
New Construction, Infrastructure
Bidding
WI

T. Two Rivers, East Hillcrest Road, East Twin River Bridge and Approaches
Infrastructure
Bidding
$750,000 to $999,999 est. value
Manitowoc, WI

2021 Cold-In-Place Asphalt Recycling
Post-Bid
Manitowoc, WI

Portland Cement Concrete Road Reconstruction
Post-Bid
Two Rivers, WI 54241

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

2021 Road Improvements (TRID)
Results
Less than $480,000 est. value
Two Creeks, WI

Road Projects
Infrastructure
Bidding
$123,000 est. value
Kiel, WI 53042

Hot Mix Paving
Post-Bid
Reedsville, WI 54230

2021 Street, Parking and Trail Improvements
Results
$115,000 est. value
Kiel, WI 53042

Pavement Repair
Post-Bid
Cleveland, WI 53015

2021 Concrete Paving I and Concrete Slab Replacement
Results
Manitowoc, WI

Pulverizing Chip Sealing
Post-Bid
WI

Asphaltic Concrete Paving
Results
Manitowoc, WI 54220

Hot Mix Resurfacing (Overlay) on Asphalt Pavement of Wagon Wheel Road
Post-Bid
Manitowoc, WI 54220

Concrete Paving III (South 30th Street Reconstruction)
Results
Manitowoc, WI 54220

Reported 05/10/2022 12:00 AM
Project Title

Chip and Seal Surfacing

Physical Address View project details and contacts
City, State (County) Cleveland, WI   (Manitowoc County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected June 2022
Bids Due View project details and contacts
Estimated Value $80,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Chip and Seal Surfacing (must use 3/8" granite) 190th St. - State Hwy. 64 to Co. E 153rd St. - All 205th St. - Co. R to 190th Ave., and 190th Ave. from 205th St. to culvert 230th St. - Oemig Rd. Co. Z north to end of blacktop 205th St. - Goller Rd. State Hwy. 64 to Co. Z DOUBLE CHIP & SEAL 230th Ave. - Potaczek Rd., from 220th St. west to end Crack Fill 200th St. - Elftman Rd., Co. Z to end of segment 230th St. - Carrell Rd., State Hwy. 64 to Co. Z 240th Ave. - Thompson Rd., west from Co. CC to end of blacktop 225th Ave. - Co. E to end of blacktop LRIP PROJECT 200th St., Cemetery Rd., 3" lift of base coarse gravel on blacktop, then grind blacktop Crushed Gravel 1,500 yards, 3/4" gravel, delivered anywhere in township or stockpiled at town hall. A separate bid price is required for each road segment.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents