Similar Projects
Northern Valley Law Enforcement Memorial
New Construction
Conception
$250,000 est. value
Grand Forks, ND 58201

Lindewood Playground Improvements
Post-Bid
Fargo, ND 58103

Promontory Point Park
New Construction
Post-Bid
$416,140 est. value
Bismarck, ND

Riverwood Golf Course Cart Path Resurfacing - Phase II
Results
$305,000 to $325,000 est. value
Bismarck, ND 58504

Construction of Park Improvement - Terra Gardens Park
Results
$400,000 est. value
Horace, ND

North Central Park Improvements
Post-Bid
$857,049 to $1,142,733 est. value
Bismarck, ND

Playground Equipment
Results
Bismarck, ND 58503

Schnell Trail Improvements
Renovation
Post-Bid
$25,000 to $250,000 est. value
Dickinson, ND

Unit 1 - Sertoma Park Improvements
Results
$210,000 to $280,000 est. value
Bismarck, ND 58504

Meadowlark Park Playground Equipment
Renovation
Post-Bid
$300,000 est. value
Horace, ND

Unit 2 - Sleepy Hollow Park Improvement
Results
$158,000 to $211,000 est. value
Bismarck, ND 58501

New Town Schools Athletic Track Reconstruction
Renovation
Post-Bid
New Town, ND

Unit 4 - Capitol Outfall Shared Use Path Improvement
Results
$157,000 to $209,000 est. value
Bismarck, ND

Terra Gardens Park Playground Equipment
Renovation
Post-Bid
$275,000 est. value
Horace, ND

Unit 3 - Gateway Pond Shared Use Path Improvement
Results
$240,000 to $320,000 est. value
Bismarck, ND

Last Updated 09/30/2021 12:15 PM
Project Title

Z--ABA Walkways in Picnic Area & Overlook at Theodore

Physical Address View project details and contacts
City, State (County) ND   (McKenzie County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $100,000 to $250,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Historically Underutilized Business (HUBZone) Set-Aside: ABA Walkways in Picnic Area & Overlook at Theodore Roosevelt National Park: project involves work at the North Unit’s Juniper Campground, picnic area, and Oxbow Overlook locations. Work consists of the removal of 2,041 feet of old asphalt path and the construction and installation of concrete paths with an approximate total length of 1,525 feet of 5 feet wide concrete. All concrete paths shall conform to ADA/ABA regulations. *AMD: Block 10 of the SF 1442 incorrectly states the walkway width of 5 feet. The correct walkway width is 6 feet as depicted in the drawings.

Details

Park/Playground, New Construction.
Division 01 - General Requirements, Temporary Barriers and Enclosures, Temporary Protective Walkways.
Division 05 - Metals, Metal Stairs, Metal Walkways.
Division 09 - Finishes.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents