Similar Projects
Highlands Drive Area Waterline Replacement
Infrastructure
Bidding
$1,444,304 est. value
Smyrna, GA 30082

Water System Improvement - Labor Only
Infrastructure
Bidding
$800,000 est. value
Ludowici, GA

Purchase of Water Meters on an Annual Contract
Post-Bid
Lawrenceville, GA

Automated Metering Infrastructure
Post-Bid
Temple, GA

New Water Meter Installation Project
Results
Less than $1,960,250 est. value
Gainesville, GA 30501

Force Main Replacement Phase 1
Results
Buford, GA 30518

Water System Improvement - Materials Only
Infrastructure
Bidding
Ludowici, GA

On-Call Plumbing Services for Dekalb County Parks
Term Contract
Post-Bid
GA

Dunbar Road Water Main Extension
Results
Warner Robins, GA 31095

Morningside Elementary School HVAC and Plumbing Upgrades
Alteration
Bidding
$1,200,000 est. value
Albany, GA 31705

Installation of Water and Wastewater Infrastructure
Term Contract
Post-Bid
GA 31543

Lanier Filter Plant and Shoal Creek Filter Plant High Service In-Line Ultrasonic Flow Meter Installations
Results
Buford, GA 30518

West Town Elementary School Heating, Ventilation, and Air Conditioning (HVAC) and Plumbing Upgrades
Alteration
Bidding
$1,200,000 est. value
Albany, GA 31707

Water Meter Testing Services
Term Contract
Post-Bid
Gainesville, GA

Construction of Highway 297 Industrial Park Old Nunez Road Water Line
Results
Swainsboro, GA 30401

Last Updated 06/23/2022 01:16 AM
Project Title

North Clayton Control Valve

Physical Address View project details and contacts
City, State (County) Clayton, GA   (Rabun County)
Category(s) Sewer and Water, Single Trades
Sub-Category(s) Plumbing, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $150,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of, but is not limited to the following major elements: Installation of control valve, concrete vault, bypass piping, and all related appurtenances. Owner will provide the 6-inch control valve and 4-inch pressure reducing valve. Time of completion for all work associated with this project shall be 150 consecutive calendar days from the date of a written "Notice to Proceed" from owner.

Details

Division 22 - Plumbing, Common Work Results for Plumbing.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents