Similar Projects
Kootenai Bunco Road Improvements
Term Contract
Design
Athol, ID 83801

I-86/I-15 Sys IC Reconstruction Pre Advertisement Presentation
Infrastructure
Bidding
ID

Widen the Roadway to a Two-lane Urban Road With Bicycle Lanes, Turn Lanes, Storm Drainage Improvements
Infrastructure
Bidding
ID

Construction Services for Cleanup of Upper Basin of the Bunker Hill Mining and Metallurgical Complex Superfund Site
Infrastructure, Alteration
Post-Bid
ID

Spruce Street Road Maintenance Project
Infrastructure
Results
Less than $200,000 est. value
Sandpoint, ID 83809

SH-64, NezPerce to Drake Road
Infrastructure
Results
$100,000 to $500,000 est. value

Constructing a New Eastbound Port of Entry (Poe) Facility on I-84 at MP 219 and Removing the Existing Cotterel POE
Infrastructure
Bidding
$10,000,000 to $15,000,000 est. value
ID

DIJ Construct Taxilane
Infrastructure, Alteration
Results
$1,255,580 est. value
Driggs, ID 83422

Moscow North and Moscow Alt Route
Infrastructure
Bidding

Runway 2/20 Pavement Maintenance at Sandpoint Airport
Infrastructure
Results
Sandpoint, ID 83864

Adding Two through Lanes On Us-93, Mp 57.23 To 59.49; 100 South Rd.
Infrastructure
Bidding
ID

Widening US-95 from MP 471.33 to 471.75 to add both southbound and northbound acceleration lanes
Infrastructure
Results
ID

Capital Maintenance, Phase 3, ACHD, Boise Area
Infrastructure
Bidding
$500,000 to $1,000,000 est. value
ID

Widening SH-3 and conducting levee repair between MP 91.86 and MP 89.26
Infrastructure
Results
ID

Ramsey Z-Wall Extension
Addition, Alteration
Results
Coeur d'Alene, ID 83815

Reported 11/24/2021 12:00 AM
Project Title

Culdesac Canyon Passing Lane, PH 3

Physical Address View project details and contacts
City, State (County) (Lewis, Nez Perce Counties)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $10,000,000 to $15,000,000
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Adding a southbound passing lane and replacing the Rock Creek culverts with a three-sided box culvert on US-95, MP 283.83 to MP 286.13

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents